Home›Load Management›M13014›Evidence
Topic/Matter Intersection

Topic:"Load Management" in M13014

Matter: Nova Scotia Power Inc. - CI C0068719 - IT - Distributed Intelligence Apps - $3,165,790
2 passages 1 document

Load Management across all matters →

N-2NSPI (NSEB) RIR 1 to 15 - Redacted 2 passages
Developing p. p. 52
Developing » Function: Load shed on individual targeted meters quickly (e.g. in less than a minute) that meets utility scale, security, and equity requirements

AI summary The document discusses the function of quickly shedding load on individual targeted meters, meeting utility scale, security, and equity requirements.

» Benefits: p. p. 52
» Benefits: - Optimal load shedding with granularity and maximizing load available for shedding - Equitable load shedding by enabling non-critical loads near critical loads to be shed

AI summary The benefits discussed include optimal load shedding with high granularity and the ability to equitably shed non-critical loads near critical loads, ensuring efficient and fair energy management.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →