GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 3 of 5 p. p. 37
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 3 of 5 (3) The customers will reduce their available interruptible system load by the amount required by NSPI within ten (10) minutes of NSPI initiating and sending notice to the custom...

AI summary The text outlines the requirements and penalty structures for a Generation Replacement and Load Following tariff. Customers must be able to reduce interruptible system load within ten minutes of a notice from NSPI, maintaining a dedicated telephone system and staff. The Company may also use automated control to interrupt load held as Operating Reserve. Non-compliance results in two-part penalties: a Threshold Penalty (cost of firm billing) and a Performance Penalty based on residual demand and average demand during the interruption event, capped at twice the firm billing cost.

REDACTED 2027 AAR Appendix E3 Page 7 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 37
REDACTED 2027 AAR Appendix E3 Page 7 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Small Industrial Medium Industrial Large Industrial- FIRM 26,247,876 38,224,517 24,806,200 23,551,766 34,810,937 22,381,224 23,891,198 37,629,007 21,393,...

AI summary The document presents a data table detailing load and consumption metrics for various industrial and municipal categories, including Small, Medium, and Large Industrial (FIRM and INT) segments, as well as PHP Municipal and Unmetered loads. It tracks these figures across multiple time periods or scenarios, concluding with a total for Shore Power EBS In-Province. The data appears to be part of the 2027 Annual Adjustment Rate (AAR) proceeding, specifically relating to load forecasting or historical consumption analysis.

GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 3 of 5 p. p. 37
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 3 of 5 customer from its responsibilities under this rider. (3) The customers will reduce their available interruptible system load by the amount required by NSPI within ten (10) minute...

AI summary This section outlines the operational requirements and penalties for customers participating in the Generation Replacement and Load Following Tariff. Customers must be able to reduce interruptible system load within ten minutes of notification and maintain a dedicated telephone system for automated dialing. The Company may use automated controls to interrupt load for Operating Reserve. Failure to comply with load reduction requirements results in a two-part penalty consisting of a Threshold Penalty (cost of firm billing) and a Performance Penalty based on the specific performance during the event.

The Energy Charge is made up of the following components: p. p. 37
The Energy Charge is made up of the following components: Energy Charge Components cents per kWh Fixed Cost Adder from Energy Balancing Service Tariff 2.1552.253 Annually Adjusted Energy Savings Credit 0.000 Annual Energy Cost Adjustment 2...

AI summary The text defines the components and applicability of the Energy Charge. The charge consists of a Fixed Cost Adder from the Energy Balancing Service Tariff and an Annually Adjusted Energy Savings Credit, totaling approximately 4.33 cents per kWh. This charge applies to the monthly displaced energy of a Load Resource Supplier (LRS) on Nova Scotia Power's generation system, calculated as the total monthly LRS load (including distribution losses) minus the top-up quantity determined under the Energy Balancing Service Tariff.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →