ng with this directive, E1 incorporated updated avoided costs from NS Power, from the 2022 Evergreen IRP in the 2026 DSM Extensio[n11](#page-20-1) and subsequently for the 2027–2031 DSM Plan as well. Specifically, E1 has used the avoided c...
AI summary E1 incorporated updated avoided costs from NS Power into its 2026 DSM Extension and 2027–2031 DSM Plan, noting differences in capacity and energy avoided costs. E1 references the More Access to Energy Act, requiring NSIESO to conduct integrated resource planning (IRP) and collaborate on demand-side management (DSM) calculations. Cross-references include NSUARB decisions and legislative sections.