Topic/Matter Intersection

Topic:"Multi Year Planning Cycle" in M10569

Matter: P-194 - Nova Scotia Power Inc. (NSPI) - 2022 Load Forecast Report
9 passages 6 documents

Multi Year Planning Cycle across all matters →

N-2NSPI (CA) RIR-1 to RIR-17 - Redacted 2 passages
Section 29
cover, precipitation and wind speed. 28 (g) Please provide NS Power’s best estimate (quantitative or qualitative) as to the impact 29 of cloud cover, snow cover, precipitation, and wind speed on loads, including peak 30 loads. Date Filed:...

AI summary NSPI provides data on variables affecting energy loads, including temperature, precipitation, and wind speed, in response to a request about their impact on peak loads. A graph shows an 85.6% correlation between temperature and load (R²=0.8556). NSPI classifies variables like temperature and wind speed as objective, while others (e.g., visibility) are sometimes subjective.

Section 30
Objective Wind speed km/h Yes Hourly Objective Visibility km Sometimes Hourly Objective Date Filed: July 8, 2022 NSPI (CA) IR-13 Page 2 of 3 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 10 - Year Energy and Demand Forecast (2022 Load Foreca...

AI summary NSPI submitted a 10-year energy and demand forecast as part of the NSUARB M10569 proceeding, responding to consumer advocate information requests. The document includes a load forecast report and is part of the regulatory process for energy planning.

N-4NSPI (NSUARB) RIR-1 to RIR-36 1 passage
Section 4
NSPI (NSUARB) IR-2 Page 1 of 6 10 - Year Energy and Demand Forecast (2022 Load Forecast Report) (NSUARB M10569) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 2 3 4 E3’s modeling is based on its PATHWAYS stock rollover mo...

AI summary NSPI responds to NSUARB's information request regarding a 10-Year Energy and Demand Forecast, detailing E3's PATHWAYS stock rollover model. The model assumes 100% EV adoption for personal light-duty vehicles by 2035, with 30% achieved by 2030, based on vehicle lifetimes and sales-stock relationships.

N-6NSPI (Synapse) RIR-1 to RIR-43 - Redacted 2 passages
Preamble
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 10 - Year Energy and Demand Forecast (2022 Load Forecast Report) (NSUARB M10569) NSPI Responses to Synapse Energy Economics Inc. Information Requests NON-CONFIDENTIAL 1 Request IR-1: 2 3 Report T...

AI summary The document details NSPI's responses to Synapse Energy Economics Inc.'s information requests regarding the 2022 Load Forecast Report (NSUARB M10569). It includes provision of historical sales data, energy usage metrics, load data, and unmetered sales information, with specific references to attachments and figure listings.

1,117.96 2,203.83 659.79 62.91 1.01 30.91 324.33 0.00 59.69 1.53 1,779.35 528.82 358.46 44.46 177.99 50.79 47.46 762.74 418.19 359.53 0.00 1,423.21 0.97 1,382.24 0.00 0.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 112.51 9,868.73
0 -38.87721 0 4,057.23 117.67 5,732.55 (394.83) 85.60 89.13 61.80 73.23 88.71 52.28 - - (38.88) - 9,924.49 T-Stat 46.18 3.522 44.668 -4.414 3.766 3.974 5.045 10.428 5.832 5.468 3.793 -2.995 3.948 4.651 2016 3,728.9 164.2 6,034.3 3,850.0 22...

AI summary The text presents financial and statistical data spanning 2016–2020, including metrics like T-Stat and P-Value, suggesting analysis of cost recovery, fuel adjustments, or regulatory compliance. The data may relate to Nova Scotia Power Inc.'s operations under NSUARB oversight, though explicit claims or program names are absent.

N-7Refiled NSPI (CA) RIR 1 to RIR-17 - Redacted 2 passages
Section 17
mVarsNew.Cool_Var 0.830 0.399 2.078 4.02% mVarsNew.Heat_Var 1.375 0.104 13.276 0.00% Date Filed: July 8, 2022 NSPI (CA) IR-7 Page 1 of 3 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 10 - Year Energy and Demand Forecast (2022 Load Forecast R...

AI summary The document includes a 10-year energy and demand forecast from NSPI's 2022 Load Forecast Report (NSUARB M10569) and NSPI's responses to consumer advocate information requests. Filed on July 8, 2022, it contains non-confidential data related to energy usage projections and stakeholder engagement.

Section 28
NSPI (CA) IR-12 Page 1 of 1 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2022 LFR CA IR-12 Attachment 1 Page 1 of 1 Jan Feb Mar Apr May Net System Requirement (GWh) 1,242 1,096 1,091 913 836 System Peak (MW) 2,216 2,112 2,024 1,720 1,422 RE...

AI summary The document presents monthly energy data (January-May) including Net System Requirement and System Peak, referencing NSPI's responses to the Consumer Advocate's information requests. It cites the 2022 Load Forecast Report (NSUARB M10569) as part of a 10-year energy and demand forecast.

N-11E1(NSPI) RIR-1 to RIR-2 1 passage
Section 8
2024 M10473 E-1(i) Appendix A Attachment 4 2023- n/a 2025 Settlement Plan Measure Level Energy Efficiency Technical Tables • Rows 254, 255, 256, 257 • Column Z 2025 M10473 E-1(i) Appendix A Attachment 4 2023- n/a 2025 Settlement Plan Measu...

AI summary EfficiencyOne (E1) provides data on heat pump energy savings from DSM Plans and technical tables for NS Power’s 2025 Settlement Plan. The document references measure-level energy efficiency data and a 10-year forecast proceeding (M10569).

86619E1 (NSPI) IR-1 to IR-12 1 passage
Section 4
ests to Nova Scotia Power Inc. (NS Power) In the Matter of Nova Scotia Power Incorporated’s 2022 Load Forecast Report – M10569 NON-CONFIDENTIAL 1 Request IR-04: 2 Reference: NS Power 2022 Load Forecast, page 15, lines 3-8. 3 “As part of th...

AI summary NS Power's 2022 Load Forecast Report discusses collaboration with E3 to model space heating and EV uptake scenarios aligned with climate goals. Questions address market alignment with federal and provincial mandates, risk mitigation for electrification, and processes for determining necessary interventions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →