Topic/Matter Intersection

Topic:"Multi Year Planning Cycle" in M11764

Matter: Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024
10 passages 6 documents

Multi Year Planning Cycle across all matters →

N-1Report 2 passages
Section 2
NON-CONFIDENTIAL 2024 10-Year System Outlook Non-Confidential

AI summary The document title indicates a 2024 10-Year System Outlook, suggesting a long-term planning document for Nova Scotia's energy system. The non-confidential designation implies the content is publicly accessible, though no substantive details are provided in the excerpt.

Section 40
Page 14 of 67 2024 10-Year System Outlook Non-Confidential

AI summary The document begins on page 14 of a 67-page non-confidential proceeding, titled '2024 10-Year System Outlook.' No substantive content is visible in the provided text.

N-2NSPI (CA) RIR-1 to RIR-6 - Redacted 1 passage
Section 1
REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2024 10-Year System Outlook Report (NSUARB M11764) NSPI Responses to CA Information Requests NON-CONFIDENTIAL

AI summary The document is a redacted version of the 2024 10-Year System Outlook Report (NSUARB M11764), which includes NSPI's responses to Commission information requests. It outlines regulatory proceedings involving infrastructure planning and standardized filing processes.

N-3NSPI (NSUARB) RIR-1 - RIR-18 2 passages
Section 29
000 GWH the 3 corresponding installed capacity is 585 MW. Even accounting for attrition, 416 MW is within the 4 range of potential installed capacity to be awarded for the Green Choice Program. Date Filed: September 19, 2024 NSPI (NSUARB)...

AI summary The text references the Green Choice Program (GCP) with installed capacity figures (585 MW corresponding to 000 GWh) and notes that 416 MW falls within the potential range for GCP. It cites the 2024 10-Year System Outlook Report (NSUARB M11764) and NSPI's response to NSUARB information requests.

Section 38
2024 10-Year System Outlook Report (NSUARB M11764) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 • Established Appendix H to include Technical Rationales. 2 3 • Alignment with NERC Standards: 4 • Table 3 Bus Section Faul...

AI summary NSPI updated the 2024 10-Year System Outlook Report by adding Appendix H with technical rationales and aligning with NERC standards via specific fault criteria. The NSUARB-led review of Directory 7, divided between two task forces, has progressed through draft revisions, with TFCP's work completed and TFSP's ongoing. Key milestones include open process reviews and final approvals by December 2024.

N-4NSPI (SBA) RIR-1 to RIR-6 1 passage
Section 6
1 Request IR-2: 2 3 Refer to the Report Section 3.2.1 - Path to 2030 and Evergreen IRP, Figure 6, Page 17 of 67. 4 There are multiple discrepancies between the timing and capacity volume of resource 5 additions in this table and the expect...

AI summary The document highlights discrepancies between NSPI’s Path to 2030 Report and the 10-Year System Outlook in resource timing and capacity. NSPI reconciles differences by explaining project completion timelines versus winter availability periods, affirming 2030 targets remain on track with stakeholder collaboration.

N-5NSPI (SWEB) RIR-1 to RIR-5 1 passage
Section 10
Upgrades associated with their project. In this way, any Network Upgrades that may also be needed 24 for lower queued projects can be built regardless of the in-service date for the original generating 25 facility. 26 27 Section 17 of the...

AI summary The text outlines Section 17 of the GIA, which allows non-compliant projects to be placed into Default if milestones are missed, with a 30-day cure period. It also references NSPI's responses to SWEB's information requests regarding the 2024 10-Year System Outlook Report (NSUARB M11764).

N-6Rebuttal Evidence - NSPI 3 passages
Section 10
Page 4 of 16 2024 10-Year System Outlook Report – Rebuttal Evidence Non-Confidential

AI summary The document is a rebuttal to the 2024 10-Year System Outlook Report, though no specific content or arguments are detailed in the provided text. It is labeled as non-confidential.

Section 15
m Outlook reports and Integrated Resource Plans, as needed.” 8 In this way, the Company 26 may develop and report on any applicable associated mitigating strategies as any potential issues 27 arise in the period beyond 2030. 7 Small Busine...

AI summary The Small Business Advocate (SBA) submitted comments on NSPI's 2024 10-Year System Outlook Report, emphasizing the need for mitigating strategies to address potential issues beyond 2030. The report highlights the company's obligation to develop and report on such strategies as part of its integrated resource planning process.

Section 26
of the ECEI and Section 4D battery storage projects into a single 150 MW project 23 application represents a reduction in anticipated energy storage projects through 2029”. 19 24 The Path to 2030 provided the following: 25 16 NS Power Lett...

AI summary The document discusses the consolidation of ECEI and Section 4D battery storage projects into a single 150 MW initiative, noting a reduction in anticipated energy storage projects through 2029. It references the 2024 10-Year System Outlook Report and includes submissions from the Consumer Advocate and NS Power regarding regional dispatch optimization and system outlook.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →