Topic:"Multi Year Planning Cycle" in M12696

Matter: NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
2 passages 2 documents

Multi Year Planning Cycle across all matters →

N-2NSPML (BW) RIRs 1-22 - Redacted 1 passage
3.2.3 Global Comparison of Hydropower Permitting Process p. pp. 158-160
government: national, regional, and/or local. The need for coordination, along with extensive study requirements and stakeholder consultations, result in multiyear hydropower authorization processes. Figure 21 summarizes information about...

AI summary The global hydropower permitting process varies significantly by region and project size, with larger projects requiring multiyear authorization due to complex studies and stakeholder consultations. Examples include Canada (3.3–5–6 years), Norway (1–2 vs. 4+ years), and the U.S. (median 3.34 years). Uncertainty and cost are higher in countries like Portugal and Spain, while small projects dominate in the UK and Germany.

N-7Evidence - BW 1 passage
Section 246 p. p. 18
- NS Block, measured in MWh (excluding Make-up Energy), is received during each of 12 - consecutive months."[41](#page-18-1) In introducing this requirement, the Board also stated: - NSPML/NS Power may apply to the Board for relief if it c...

AI summary The requirement mandates NSPML to receive twelve consecutive months of NS Block volumes (excluding Make-up Energy) at least 90% of the total monthly volumes called for under the Energy and Capacity Agreement. This prevents over-reliance on Make-up volumes and ensures consistency and predictability in volume delivery.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →