1397 474 379 0 1 ETR 2 ETRs 3 ETRs 4 ETRs 5 ETRs or more 2 3 Figure 19 shows that less than 27 percent of all outage events had multiple ETRs, highlighting 4 NS Power’s efficiency and accuracy in the initial assessment of the outages. Addi...
AI summary NS Power demonstrated efficiency in outage restoration, with less than 27% of outages requiring multiple ETRs. The 2025 Annual Performance Standards Report confirms NS Power met targets for restoring 95.05% of customers within 48 hours during significant events, 91.98% during major events, and 78.38% during extreme events.
1.02 1.04 2.17 0.08 0.28 0.27 1.07 0.32 0.12 55N-204 0.07 1.16 0.15 0.17 2.06 1.04 1.05 0.21 0.15 0.13 0.83 1.28 6.60 0.14 55V-313 0.78 2.34 1.64 2.24 1.67 2.45 0.82 1.89 14.70 2.88 8.85 1.24 2.52 1.88 55V-314 2.20 1.26 1.90 2.49 2.02 2.83...
AI summary The document presents statistical data on performance standards for CKAIFI and CKAIDI metrics from 2019 to 2025, excluding MED/EXT events. It includes averages, standard deviations, and thresholds for circuit-level service reliability, reflecting trends in interruption frequency and duration.
0.15 2.16 1.32 6.19 3.33 2.17 0.77 0.43 4.28 4.71 4.57 16.24 0.79 81S-302 1.35 1.42 0.31 2.90 9.52 4.15 2.08 3.40 3.32 0.97 13.34 11.75 11.83 0.52 81S-303 3.52 2.31 1.10 1.04 8.35 3.05 3.49 4.22 6.71 1.92 1.87 21.31 14.92 11.77 2025 Perfor...
AI summary The text presents statistical data on performance standards excluding MED/EXT events, with metrics like CKAIFI and CKAIDI for 2019–2025. It includes averages, standard deviations, and thresholds for circuit interruption frequency and duration, indicating analysis of system reliability and service performance over time.