1.1 Impact Evaluation Objectives and Scope p. p. 11
1.1 Impact Evaluation Objectives and Scope The impact evaluation activities were aimed at determining: - › Gross electrical energy and peak demand savings at the meter and at the generator - › Available DR capacity for DR programs - › Net-...

AI summary The impact evaluation objectives include assessing energy savings, demand response capacity, net-to-gross ratios, effective useful life, and GHG emissions. Two evaluation types (comprehensive and condensed) are outlined, with factors like program maturity and complexity influencing their application.

4 Impact Evaluation Results p. pp. 22-23
4 Impact Evaluation Results This section presents an analysis of the impact evaluation results for all program components by comparing 2025 tracked electrical energy and peak demand savings with evaluated electrical energy and peak demand...

AI summary This section compares 2025 tracked electrical energy and peak demand savings with evaluated savings, presenting NTGRs, lifetime energy savings, and GHG emission reductions. It evaluates program component impacts through these metrics.

E-12E1 (NSEB) RIRs 1-66 - Redacted 1 passage
Avoided Supply Cost (Benefits) p. p. 37
Avoided Supply Cost (Benefits) Given the differences between Union Gas' and Enbridge's geography, system and customers and such, it is expected the avoided supply cost will be different between the two gas utilities. Under the TRC-plus tes...

AI summary The document discusses avoided supply costs under the TRC-plus test, noting differences between Union Gas and Enbridge due to geography, system, and customer factors. Benefits include avoided natural gas costs, transmission and distribution costs, and a 15% non-energy benefit adder for environmental, economic, and social benefits.

E-21-(i)Resume - Theodore Love 1 passage
Testimony and Proceeding Participation p. p. 0
Testimony and Proceeding Participation Forum On Behalf Of Docket/Matter Date Issues Addressed Pennsylvania Public Utility Commission UGI Gas Utilities Inc. – Gas Division Docket No. M-2024- 3048418 - Petition of UGI Gas for Approval of Pha...

AI summary The document outlines testimony and proceeding participation in regulatory forums, including energy efficiency plan design, updates to rate cases, and issues related to grid hardening and environmental justice.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →