Topic/Matter Intersection

Topic:"Nova Scotia Greenhouse Gas Emissions Regulations" in M04819

Matter: E-ENSC-R-12 - Efficiency Nova Scotia Corporation - Application for Approval of its Demand Side Management (DSM) Plan for 2013 - 2015
3 passages 2 documents

Nova Scotia Greenhouse Gas Emissions Regulations across all matters →

E-12ENSC (Synapse) Responses to IR-1 to IR-14 (REDACTED) 1 passage
Preamble
generation plans for the No DSM and With DSM cases which include Bowater and Port Hawkesbury Paper Mill PM2 load. b) Please refer to Confidential Attachment 2. c) Please refer to Confidential Attachment 3. The loads and firm capacity (reso...

AI summary The document discusses generation plans for both No DSM and With DSM cases, including specific loads and firm capacity. It mentions that transmission avoided costs are considered minor compared to energy and capacity costs. DSM programs are not geographically directed, and their impact on distribution upgrades is limited. Both plans account for environmental and system constraints, including greenhouse gas regulations.

E-12(r)ENSC (Synapse) Responses to IR-1 to IR-14 (REVISED) (REDACTED) 2 passages
12
12 Rate Class 2013 2014 2015 7 workpapers and calculations. 8 9 b) Please provide separate estimates of avoided energy costs and avoided capacity 10 costs, for each year 2012 through 2032. 11 12 c) Please provide a table presenting the Nov...

AI summary The text requests detailed estimates of avoided energy and capacity costs from 2012 to 2032, along with explanations on whether these costs account for transmission and distribution costs and compliance with greenhouse gas regulations. The response refers to a confidential attachment and a long-term value of $135/MWh for avoided costs.

Preamble
generation plans for the No DSM and With DSM cases which include Bowater and Port Hawkesbury Paper Mill PM2 load. b) Please refer to Confidential Attachment 2. c) Please refer to Confidential Attachment 3. The loads and firm capacity (reso...

AI summary The text discusses generation plans with and without demand-side management (DSM), referencing specific attachments and transmission avoided costs. It notes that DSM programs are not geographically targeted and that avoided costs consider Nova Scotia's greenhouse gas regulations. Both DSM and non-DSM plans use the same environmental and system constraints.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →