Topic/Matter Intersection

Topic:"Ns Nb Reliability Intertie Project" in M03324

Matter: E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria
1 passage 1 document

Ns Nb Reliability Intertie Project across all matters →

07810Quarterly Application for Approval of Reliability Standards of the North American Electric Reliability Corporation - September 2, 2011 9/6/2011 1 passage
2. Violation Severity Levels: p. p. 86
2. Violation Severity Levels: R# Lower VSL Moderate VSL High VSL Severe VSL the Interchange Schedule with the HVDC tie as specified in R1.2 the Interchange Schedule with the HVDC tie as specified in R1.2 the Interchange Schedule with the H...

AI summary The document outlines violation severity levels (VSL) related to the Interchange Schedule with the HVDC tie as specified in R1.2, categorizing them into Lower, Moderate, High, and Severe levels.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →