Section 32
13 Import energy contract is currently delivered via the Nova Scotia/New Brunswick Intertie. 14 https://www.nerc.com/pa/Stand/Pages/Project2007-09-Generator-Verification.aspx DATE FILED: June 30, 2022 Page 12 of 60 2022 10-Year System Outl...
AI summary The document references the import energy contract delivered via the Nova Scotia/New Brunswick Intertie and mentions the 2022 10-Year System Outlook. A link to a NERC generator verification project is included, though the main focus is on transmission infrastructure and long-term system planning.