Topic/Matter Intersection

Topic:"Ns Nb Reliability Intertie Project" in M10653

Matter: P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2022
1 passage 1 document

Ns Nb Reliability Intertie Project across all matters →

N-1Report 1 passage
Section 32
13 Import energy contract is currently delivered via the Nova Scotia/New Brunswick Intertie. 14 https://www.nerc.com/pa/Stand/Pages/Project2007-09-Generator-Verification.aspx DATE FILED: June 30, 2022 Page 12 of 60 2022 10-Year System Outl...

AI summary The document references the import energy contract delivered via the Nova Scotia/New Brunswick Intertie and mentions the 2022 10-Year System Outlook. A link to a NERC generator verification project is included, though the main focus is on transmission infrastructure and long-term system planning.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →