Topic:"Nuclear Power" in M12696

Matter: NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
1 passage 1 document

Nuclear Power across all matters →

N-4NSPML (IG) RIRs 1-26 - Redacted 1 passage
Article 9. Operations p. p. 119
ble Efforts to keep outages of the Large Generating Facility's governor or equivalent controls to a minimum whenever the Large Generating Facility is operated in parallel with the Transmission System. - 9.6.4.2 Timely and Sustained Respons...

AI summary The text outlines requirements for Large Generating Facilities to ensure timely and sustained real power response during frequency deviations, with exemptions for US NRC-regulated facilities and behind-the-meter generation sized-to-load. Compliance with Commission-approved reliability standards is emphasized.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →