Article 9. Operations
p. p. 119
ble Efforts to keep outages of the Large Generating Facility's governor or equivalent controls to a minimum whenever the Large Generating Facility is operated in parallel with the Transmission System. - 9.6.4.2 Timely and Sustained Respons...
AI summary The text outlines requirements for Large Generating Facilities to ensure timely and sustained real power response during frequency deviations, with exemptions for US NRC-regulated facilities and behind-the-meter generation sized-to-load. Compliance with Commission-approved reliability standards is emphasized.