Topic:"Operating Expenses" in M08604

Matter: E-ENS-R-18 - EfficiencyOne - 2019 Demand Side Management (DSM) Plan Application, 2017 Annual Progress Report  and 2017 Evaluation Reports
2 passages 2 documents

Operating Expenses across all matters →

E-7NSPI (SBA) RIRs to IR-1 to IR-5 - Redacted 1 passage
Section 73
and 2017 Evaluation Reports (NSUARB M08604) NSPI Responses to SBA Information Requests NON-CONFIDENTIAL 1 Request IR-3: 2 3 What is the overhead cost to NSP to administer the contract of the proposed 2019 DSM 4 plan including the cost to p...

AI summary NSPI has not calculated the overhead costs to administer the proposed 2019 DSM plan, including participation in the DSMAG Working Group, as this cost is part of NS Power’s overall OM&G budget managed by multiple internal groups.

E-11E1 (Synapse) RIRs to IR-1 to IR-22 1 passage
Section 193
EfficiencyOne cannot provide actual values 28 for Cost-Effectiveness Tests and Lifetime Benefits. Instead, the known actual values 29 of Program Administrator costs, energy savings and system peak demand savings allow 30 EfficiencyOne to c...

AI summary EfficiencyOne is unable to provide actual values for Cost-Effectiveness Tests and Lifetime Benefits. Instead, they use known Program Administrator costs, energy savings, and system peak demand savings to calculate the data presented in Tables 1 through 18 of the 2019 Demand Side Management (DSM) Resource Plan.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →