Matter: NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
6 passages 3 documents

Operating Expenses across all matters →

N-2NSPML (BW) RIRs 1-22 - Redacted 4 passages
Chapter 5 — U.S. Hydropower Cost and Performance Metrics p. pp. 109-111
fect of size on O&M costs. Figure ES-11. Trend in operations and maintenance costs for hydropower projects by size class Source: FERC Form 1, Bureau of Labor Statistics Note: Number of plants by size category: 7 (Very Large), 42 (Large), 1...

AI summary The text analyzes U.S. hydropower operations and maintenance (O&M) costs, comparing federal and non-federal fleets. Federal entities like the U.S. Army Corps of Engineers and Bureau of Reclamation report average O&M costs of $471 million and $469 million annually, respectively, while non-federal plants have lower per-MW costs. Data sources include FERC Form 1 and the Bureau of Labor Statistics, highlighting trends by plant size and operational age.

NSD new stream-reach development p. p. 116
NSD new stream-reach development AWIA American Water Infrastructure Act of 2018 O&M operations and maintenance Figure 21. Duration of the hydropower authorization process in selected countries and projects Figure 22. Hydropower feed-in tar...

AI summary The document presents a series of figures analyzing various aspects of hydropower and energy storage technologies, including authorization processes, revenue streams, pricing trends, and cost data from 1980 to 2025.

5.2 Operations and Maintenance Costs p. pp. 185-187
5.2 Operations and Maintenance Costs In the past two years, O&M costs grew fastest for small plants ( ≤ 10 MW), which already have by far the highest cost per kilowatt installed per year. Because it has no fuel purchase costs, hydropower h...

AI summary The text discusses operations and maintenance (O&M) costs for U.S. hydropower and pumped storage hydropower (PSH) plants, noting that small plants (≤10 MW) have the highest O&M costs per kilowatt. Hydropower's minimal variable costs are highlighted, with O&M costs typically expressed as annual fixed costs. Figure 35 illustrates trends by plant size and age, sourced from FERC Form 1 and the Bureau of Labor Statistics.

Average O&M costs for the federal fleet are similar to those of the nonfederal fleet p. p. 187
Average O&M costs for the federal fleet are similar to those of the nonfederal fleet FERC Form 1 is required for investor-owned utilities and some public utilities. The two agencies that own more than 90% of federal hydropower (U.S. Army C...

AI summary The text compares O&M costs of federal (U.S. Army Corps of Engineers, Bureau of Reclamation) and nonfederal fleets, noting similarities. Federal agencies' O&M budgets include congressional appropriations and PMA financing. Average costs were $471M (USACE) and $469M (Reclamation) from FY2018–2020, with median plant sizes influencing expenses.

N-4NSPML (IG) RIRs 1-26 - Redacted 1 passage
Article 10. Maintenance p. p. 129
Article 10. Maintenance - 10.1 Transmission Provider Obligations. Transmission Provider shall maintain the Transmission System and Transmission Provider's Interconnection Facilities in a safe and reliable manner and in accordance with this...

AI summary Article 10 outlines maintenance obligations for Transmission Providers and Interconnection Customers under the LGIA, requiring safe and reliable upkeep of facilities, coordination in maintenance planning, cooperation on secondary systems, and allocation of operating expenses. Specific responsibilities include preventive maintenance, inspection protocols, and cost-sharing arrangements.

N-6NSPML (SBA) RIRs 1-6 - Redacted 1 passage
NSPML Responses to Small Business Advocate Information Requests
NSPML Responses to Small Business Advocate Information Requests 1 Request IR-01: 20 13-19, 2025, NSPML stated, on page 26, lines 1-2, that "Redeliveries of shortfalls 21 relating to this outage were completed in early February." 22 1. What...

AI summary The document outlines responses from NSPML to information requests regarding an unplanned outage in January 2025. NSPML clarifies that most outages were planned, and only one was unplanned due to exceptional icing. Repairs were completed the same day, and redeliveries of shortfalls were made in February 2025. The response does not address the cost of repairs or responsibility for the outage.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →