N-1Application - Redacted
97 passages
and IN THE MATTER OF an application by the Nova Scotia Independent Energy System Operator for an Order or Orders made pursuant to Section 29 of the Act for the review of its proposed expenditure and revenue requirements and the fees it pro...
AI summary The document introduces a regulatory proceeding involving an application by the Nova Scotia Independent Energy System Operator. The application seeks an Order or Orders under Section 29 of the Act to review the organization's proposed expenditure, revenue requirements, and fee structures for the fiscal year spanning April 1, 2027, to March 31, 2028.
1.3 Material Changes in the Application - The Board and parties will note that this Application differs in some respects from the prior - applications for the 2025/2026 and 2026/2027 fiscal years. The material changes or additions - fall u...
AI summary IESO Nova Scotia outlines material changes in its current application compared to prior filings for the 2025/2026 and 2026/2027 fiscal years. Key updates include a revised transition date for Phase 2A to March 2028 based on completed design work. The application also introduces a more functional alignment of OM&A expenditures within the revenue requirements to improve consistency for Board evaluation. Additionally, it details the phased implementation of the Phase 2 Control Centre project to support independent Balancing Authority and Transmission Operator functions.
1.4 Process - This Application reflects a more detailed budgeting process than was possible for IESO Nova - Scotia's first two revenue requirement applications. The organization has developed three - annual budgets within approximately 18...
AI summary IESO Nova Scotia describes the evolution of its budgeting process, moving from high-level estimates to a detailed bottom-up approach for the 2027/2028 budget. The process integrates OM&A budgets with capital plans to ensure the revenue requirement reflects asset timing, amortization, and financing costs. Key improvements include revised OM&A cost categories to align with functional departments and the provision of multi-year indicative outlooks for 2028-2030 in response to Nova Scotia Energy Board requirements.
DVM Guidelines "The Net OM&A Deferral and Variance Account is approved. However, specific guidelines and accounting policies must be developed and approved before there is a recovery of Net Ongoing OM&A amounts from the Deferral and Varian...
AI summary The Nova Scotia Energy Board has approved the Net OM&A Deferral and Variance Account (DVM). However, the Board requires IESO Nova Scotia to develop and submit specific guidelines, accounting policies, and a description of adopted financial controls before any recovery of Net Ongoing OM&A amounts can occur. These documents must be submitted by the time IESO Nova Scotia files its application for the 2027/2028 revenue requirement.
Assumptions and Expenditures Support " The Board directs that minimum filing requirements will apply to IESO Nova Scotia's future applications, including: • Formal support for all significant assumptions and expenditures in the application...
AI summary The Nova Scotia Energy Board (NSEB) establishes minimum filing requirements for IESO Nova Scotia's future applications. The Board mandates that the applicant must provide formal support for all significant assumptions and expenditures, including quotes, market information, and correspondence from discussions. IESO Nova Scotia has complied with these requirements by providing descriptions for all cost categories and supporting documentation for significant expenditures where available and appropriate.
1.8 Structure of the Application - The balance of the Application is structured as follows: - Section 2: IESO Nova Scotia Business Plan and Linkage to Proposed Expenditures and Revenue Requirement - Section 3: Proposed Expenditures and Rev...
AI summary This section outlines the organizational structure of the application submitted by IESO Nova Scotia. It details the content of six main sections, including the business plan's linkage to expenditures, specific proposed expenditures for the Phase 2 Control Centre project, amortization of IT and capital assets, and operational expenses (OM&A). Additionally, it covers the calculation of fees based on the revenue requirement and the specific reliefs sought from the Nova Scotia Energy Board.
2.1 Role of the Business Plan - IESO Nova Scotia's 2027/2028 Business Plan (Appendix 4) is filed with this Application in - accordance with the Board's direction in M12412. The Business Plan establishes the work IESO - Nova Scotia intends...
AI summary The text outlines the role of IESO Nova Scotia's 2027/2028 Business Plan in relation to its current Application. While the Business Plan and the 2027/2028 Plan describe the organization's intended work and objectives under the More Access to Energy Act (MAEA), the Application specifically details the capital expenditures, operating costs, and revenue requirements needed to achieve those goals. Together, these documents demonstrate how proposed expenditures support the organization's legislative mandate and annual enterprise priorities.
ies, and carry out the other functions - necessary to operate as an independent energy system operator. - The proposed capital expenditures for Phases 2A and 2B of the Control Centre project are the - principal costs associated with this p...
AI summary IESO Nova Scotia outlines its capital expenditures and operational priorities for the 2026/2029 fiscal years, specifically focusing on the Control Centre project (Phases 2A and 2B). The project involves approximately $48.99 million in capital work in progress to establish an independent energy system operator model, including cybersecurity and reliability compliance. Additionally, the entity emphasizes its mandate to plan and procure electricity resources to maintain system reliability, aiming to complete its first Integrated Resource Plan by 2027/2028.
2.3.6 Build a Strong Organization Where People Want to Work and Grow - The sixth enterprise priority recognizes that IESO Nova Scotia can discharge its mandate only if - it is able to attract and retain talented individuals with the requis...
AI summary IESO Nova Scotia outlines its enterprise priority to build a capable workforce to fulfill its mandate under the More Access to Energy Act. The organization plans to implement leadership development, succession planning, and recruitment strategies, particularly as it assumes specialized operational responsibilities from Nova Scotia Power. The text emphasizes that a qualified workforce is essential for system reliability and safety. Associated costs are categorized under functional and Human Resources categories, with specific provisions for capitalizing employee costs related to the Control Centre project.
3. OM&A revenue requirement These expenses support the continued delivery of IESO Nova Scotia's existing planning, procurement, interconnection, regulatory and corporate responsibilities, while also providing for initial operation of the c...
AI summary IESO Nova Scotia proposes an OM&A revenue requirement of approximately $14.76 million for 2027/2028, which is slightly lower than the 2026/2027 request despite an expanding work program. This consistency is attributed to completed transition activities and the capitalization of Control Centre project costs. However, a significant increase in operating costs is forecasted for 2028/2029 as the organization assumes real-time system operations, primarily involving the transfer of responsibilities from Nova Scotia Power.
Proposed expenditure and revenue requirements 29 (1) The IESO shall, at least 90 days before the beginning of each fiscal year, submit its proposed expenditure and revenue requirements for the fiscal year - and the fees it proposes to char...
AI summary The text outlines the regulatory requirements for the Independent Energy System Operator (IESO) regarding the submission and approval of its annual expenditure and revenue requirements. It mandates that the IESO submit these requirements and proposed fees to the Energy Board at least 90 days before the fiscal year begins. The Energy Board holds the authority to approve, refer back for further consideration, or hold hearings regarding these submissions. Additionally, it provides a statutory definition of 'revenue requirements' under the More Access to Energy Act.
3.1.1 Summary of Proposed Expenditures and Revenue Requirement - The Application includes the following costs associated with Proposed Expenditures and - Revenue Requirement: - Proposed Expenditures associated with: - o capital costs (capi...
AI summary The Application outlines proposed expenditures and the revenue requirement for IESO Nova Scotia, specifically focusing on the Phase 2 Control Centre Project. It seeks approval for $48.99M in capital work in progress (CWIP) for 2026-2030. The 2027/2028 revenue requirement of $15.19M includes amortization for the Control Centre and other IT assets, alongside $14.76M in ongoing OM&A costs. OM&A costs are projected to decrease slightly due to the conclusion of the current IRP process and lower consulting costs, offset by higher interest expenses and public education costs.
Phase 2 Control Centre - Following the successful implementation of Phase 1 in December 2025, IESO Nova Scotia - undertook a comprehensive assessment of options for establishing independent operational - control of Nova Scotia's integrated...
AI summary IESO Nova Scotia is pursuing 'Scenario 4 Enhanced Independence' for the Phase 2 Control Centre, following a comprehensive assessment of options for establishing independent operational control of the province's electricity system. This pathway involves establishing an independent control room space within Nova Scotia Power's Atlantic Data Centre and progressively transferring operational responsibilities. Scenario 4 was selected as the most prudent balance because it achieves high operational independence while avoiding the high costs of new construction and leveraging existing synergies with Nova Scotia Power systems.
3.2.2 Options Analysis - To develop the option selection process, select an option, and prepare budget estimates, IESO - Nova Scotia engaged the expert support of FTI and IBM. FTI was engaged to develop a value - framework and to quantify...
AI summary The text describes the process for selecting and budgeting options for the Independent Energy System Operator (IESO) Nova Scotia's Control Centre. Nova Scotia engaged FTI Consulting to develop a value framework to quantify the benefits and disbenefits of transitioning from a vertically integrated utility model to an independent system operator model. IBM was engaged to assess five strategic scenarios, ranging from simple models to the construction of a new control facility with new systems, and to provide AACE Class 3 cost estimates for the recommended option.
e, a phased - approach enables IESO Nova Scotia to establish an initial operating capability and assume key - responsibilities before completing the full build-out of the organization and supporting - infrastructure. Additional capabilitie...
AI summary IESO Nova Scotia proposes a phased approach for establishing its organization and infrastructure, allowing for initial operating capabilities before full build-out. This strategy provides flexibility to refine cost estimates and project scope based on operational experience. The organization is currently seeking approval for expenditures related to 'Steady State 1' (comprising Phases 2A and 2B), which are designed as an integrated operating model. Capital costs for the Phase 2 Control Centre are estimated at approximately $75.4 million over five years.
1 Figure 6: Cost Breakdown (All costs in $M) Total Phase 2A Phase 2B Phase 2C IT Costs $ 20.6 $ 0.8 $ 5.9 $ 13.9 Proqram lnteqration $ 11.4 $ 9.0 $ 1.0 $ 1.4 Control Center Build $ 9.0 $ 9.0 $ - $ - NERC Compliance $ 6.4 $ 6.4 $ - $ - Cybe...
AI summary The document provides a detailed cost breakdown for different phases (2A, 2B, and 2C) of a project, likely related to grid infrastructure or IT modernization. It categorizes expenditures into IT costs, program integration, control center construction, NERC compliance, cybersecurity, and NSP support costs. The table highlights that Phase 2A has the highest direct capital expenditures and program integration costs, while Phase 2C is significantly more weighted toward IT costs and direct capital expenditures.
IT Costs - IT Costs include the configuration and implementation of shared platforms, transferred - platforms, communications, interfaces, and other technology systems required to support - Phase 2 operations. This includes operational tec...
AI summary The text outlines the Information Technology (IT) costs associated with the configuration and implementation of shared platforms, communications, and interfaces required to support Phase 2 operations. These costs specifically cover the capabilities transferred to IESO Nova Scotia under Scenario 4, including settlement, reporting, and market administration functions. IBM developed the cost estimates using a capability-based assessment approach, incorporating EMS, SCADA, cybersecurity, and data analytics requirements based on vendor data, utility information, and analogous projects.
NS Power Support Costs - NS Power Support Costs represent incremental costs associated with support provided by NS - Power to facilitate the implementation of Phase 2, including system transition activities, - knowledge transfer, handover...
AI summary The text outlines the 'NS Power Support Costs' associated with the phased transition of responsibilities to IESO Nova Scotia under Scenario 4. These incremental costs include system transition activities, knowledge transfer, handover, reconfiguration of shared systems, and operational readiness. The estimates, developed by IBM using NS Power data, specifically cover activities during Steady State 1 where NS Power maintains support while transferring operational, settlement, reporting, and market administration capabilities to IESO Nova Scotia.
Other - Other costs cover internal IESO Nova Scotia effort, third-party vendor costs for systems to be - transferred or shared, training coordination, market changes and miscellaneous - implementation items. This category captures costs th...
AI summary The text describes 'Other' costs associated with Phase 2 implementation, which include internal IESO Nova Scotia efforts, third-party vendor costs for system transfers or sharing, training coordination, and miscellaneous items related to market changes. It specifies that these costs are necessary to complete the project scope but do not fit into predefined categories. The cost estimate was developed by IBM based on vendor information, industry benchmarks, past project experience, and professional judgment.
13 Further details regarding the costs budgeted as part of this cost category are as follows: 14 Building: This involves the design, construction, renovation, fit-out, and commissioning of IESO 15 Nova Scotia's independent Control Centre....
AI summary The text outlines the budgeted costs for IESO Nova Scotia's independent Control Centre as part of a Phase 2 project. It details four primary cost categories: building construction and office space (20-year depreciation), computer hardware for IT and OT infrastructure (5-year depreciation), software solutions for market activities and system operations (5-year depreciation), and regulatory compliance costs to meet NERC standards (10-year amortization). All estimates are based on an IBM Report and align with IESO Nova Scotia's accounting policies.
1 3.3.2 Information Technology 2 Separate from the assets deployed in the Control Centre, IESO Nova Scotia will also need to 3 implement software and hardware assets to enable additional existing business functions. As 4 more employees are...
AI summary IESO Nova Scotia identifies necessary investments in information technology (IT) and operational technology (OT) to support its foundational business functions and strategic priorities. This includes the procurement of hardware, such as computers and mobile devices, to accommodate new employees, as well as a specific software solution to manage transmission interconnection activities. The text emphasizes that these IT expenditures are essential for the organization's core operations and includes an amortization budget for these assets.
9 Figure 13: IT Amortization Budget Amortization Budget ($) Cost Category Estimated Capital Cost Amortization Period (years) 2027/2028F Computers $0.06 5 $0.01 Software $0.43 5 $0.04 Total $0.50 $0.05 10
AI summary The document provides a table outlining the IT Amortization Budget for the 2027/2028 forecast period. It breaks down the estimated capital costs and amortization periods for computers and software. The total estimated capital cost for these categories is $0.50 million with a 5-year amortization period, resulting in a total amortization budget of $0.05 million for the 2027/2028 forecast year.
3.4 Operating, Maintenance and Administration - In this application, IESO Nova Scotia seeks review and approval of its OM&A revenue requirement for the 2027/28 fiscal year of $14.76M, a slight reduction from IESO Nova Scotia's OM&A revenue...
AI summary IESO Nova Scotia is seeking approval for its 2027/28 Operating, Maintenance and Administration (OM&A) revenue requirement of $14.76M. The budget was developed using historical spending data, external evidence like quotes and contracts, and internal staff expertise. Due to its status as a new organization with limited historical data, IESO Nova Scotia acknowledges potential for variance but emphasizes a forward-looking approach to refining budgeting processes. The OM&A costs cover statutory mandates, administrative functions, and transitioned operational roles from NS Power, including upcoming bulk electricity system dispatch costs.
1 Figure 14: Summary of OM&A Costs 2027/28 OM&A Cost Forecast ($) (Millions) System Planning a Procurement $4.17 System Operations $0.74 Information Technology $2.10 Communications and Stakeholder $0.94 Legal and Regulatory $3.05 Finance $...
AI summary The document provides a breakdown of the forecasted Operating, Maintenance and Administration (OM&A) costs for the 2027/28 period. The total forecasted expenses amount to $14.76 million, with the largest individual cost components being System Planning and Procurement ($4.17 million) and Legal and Regulatory ($3.05 million). Other costs include Information Technology, Communications and Stakeholder engagement, Finance, Corporate Services, and various operational categories like Facilities and Human Resources.
1 Figure 16: Reconciliation to New Cost Categories OM&A Cost Category 2026/27 as Filed 2026/ 27 wages Reclassified 2026/27 category adjustment 2026/27 restated 2026/ 2027 Cost Categories Redistributed or Eliminated in 2027 /2028 Employees...
AI summary The document presents a reconciliation table for Operating, Maintenance and Administration (OM&A) cost categories for the 2026/27 period. It details the redistribution of costs, specifically regarding wages, governance, procurement, facilities, and transition planning. The data shows how specific costs from 2026/27 are reclassified or eliminated to align with the new cost categories established for 2027/2028, highlighting shifts into categories such as System Planning and Procurement, System Operations, Information Technology, and Legal and Regulatory.
13Merged with "Legal and Regulato1y" in 27/28. 14Merged with "System Planning and Procurement" in 27/28. 15Split into two new categories: "Information Technology" and "Facilities" in 27/28. 16Also referenced as "Phase II Transitional Costs...
AI summary The text describes the reorganization of various cost categories within a regulatory filing. Specific items are being merged into 'Legal and Regulatory' and 'System Planning and Procurement' sections, while others are being split into new 'Information Technology' and 'Facilities' categories. Additionally, it notes the redistribution of 'Phase II Transitional Costs' from the 26/27 application into various operational areas including System Operations, Communications and Stakeholder, Human Resources, and Corporate Services.
17Merged with "System Planning and Procurement" in 27/28. Finance 0.65 0.31 - 0.96 Human Resources - 0.37 0.05 0.42 Facilities - - 0.38 0.38 Corporate Services18 0.26 0.66 1.05 1.97 Total OM&A Expenses 14.85 - - 14.85 - The cost category s...
AI summary The document provides a financial breakdown of Operating, Maintenance and Administration (OM&A) expenses, categorized into Finance, Human Resources, Facilities, and Corporate Services. It notes that the 'Corporate Services' category is scheduled to be merged with 'System Planning and Procurement' in the 2027/28 period. The text serves as a transitional summary leading into a detailed analysis of revenue differences across cost categories.
Staffing and Compensation - Consistent with IESO Nova Scotia's prior revenue requirement applications (M12412 and - M12663), compensation continues to be the single largest category of cost across all functional - areas of the organization...
AI summary IESO Nova Scotia outlines its staffing and compensation requirements for fiscal year 2027/2028, noting that compensation remains its largest OM&A cost at approximately $6.9M. The staffing plan reflects the organization's growth as it assumes new responsibilities under the More Access to Energy Act (MAEA), specifically the transfer of bulk system control operations from Nova Scotia Power. The plan projects a phased increase from 55 to 91 full-time equivalents (FTEs) by March 2028, prioritizing internal hiring to build expertise and reduce project costs.
Figure 17 - FTE Projected Increases from 2026/2027 to 2027/2028 Consistent with IESO Nova Scotia's prior revenue requirement applications (M12412 and M12663), compensation continues to be single largest category of cost across all function...
AI summary The document discusses IESO Nova Scotia's staffing and compensation strategy for the 2027/2028 fiscal year. It highlights that compensation remains the organization's largest cost category, totaling approximately $6.9M. Based on a benchmarking study by Marsh, IESO Nova Scotia intends to adopt a scalable compensation framework with benchmarked pay bands to align with market median pay. The report concluded that current compensation is reasonable and below market medians, and the new framework will support future hiring and employee progression without altering the current OM&A budget.
1 Figure 18: OM&A Costs for the System Planning and Procurement Cost Category Ongoing OM&A Budget (S) Cost Category 2026/2027F Restated 2027/2028F Total System Planning & Procurement 5.10 4.17 Compensation 4.08 3.52 Procurement 1.10 0.74 S...
AI summary The document presents a budgetary breakdown of Operating, Maintenance, and Administration (OM&A) costs for the System Planning and Procurement cost category. It provides a comparison between the restated 2026/2027 forecast and the 2027/2028 forecast. Key cost components include Compensation, Procurement, and System Planning, with a notable reduction in total costs from 5.10 million to 4.17 million, partially offset by third-party recoveries.
Comparison to 2026/2027 Budget The costs in this category have reduced from 2025/2026 as the New Brunswick capacity contract moves to the project execution stage and the fast acting generation RFP gets closer to being awarded, but offset w...
AI summary The text compares the 2027/2028 budget to the 2026/2027 budget, noting a decrease in costs due to the New Brunswick capacity contract moving to the project execution stage and the progress of the fast-acting generation RFP. These savings are partially offset by new procurement costs for capacity and storage. The 2027/2028 budget specifically accounts for technical experts, legal, and communication support, while adjusting compensation from projections to actuals with a 4% allowance. One FTE has been reallocated to the Phase 2 transition project.
3.4.2 System Operations This is a new cost category in IESO Nova Scotia's Revenue Requirement Application and has been added in preparation for the transition to assume Phase 2 system operation responsibilities. Costs in this category incl...
AI summary IESO Nova Scotia has introduced a new 'System Operations' cost category in its Revenue Requirement Application to prepare for assuming Phase 2 system operation responsibilities. These costs include staff and consulting expenses transferred from Nova Scotia Power, as well as one month of OM&A costs for the Phase 2 Control Centre. The budget is based on IBM estimates and accounts for both transferred roles and incremental costs for functions where personnel remain with NS Power due to other non-transferring responsibilities.
1 Figure 19: OM&A Costs for the System Operations Cost Category Ongoing OM&A Budget (S) Cost Category 2026/2027F Restated 2027/2028F Total System Operations 1.06 0.74 Compensation 0.56 0.45 System Operation Solutions 0.50 0.29 2
AI summary The document provides a financial breakdown of the Operating, Maintenance and Administration (OM&A) costs for the System Operations cost category. It presents a restated budget for 2026/2027F and a forecast for 2027/2028F, showing a projected decrease in total costs from $1.06 million to $0.74 million. The costs are divided into two primary sub-categories: Compensation and System Operation Solutions.
3.4.3 Information Technology - IESO Nova Scotia is budgeting $2.1M in expenses as part of the Information Technology cost - category. This cost category consists of costs incurred for internal staff, Managed IT Services, - IT Application S...
AI summary IESO Nova Scotia is budgeting $2.1 million for Information Technology costs to support its functional areas and business mandates. These expenses cover internal staff, Managed IT Services, IT Application Software, and other technology services. The organization's technology strategy is heavily influenced by the utilization of cloud and managed services, which are deemed necessary to execute its strategic priorities and meet future requirements.
1 Figure 20: OM&A Costs for the Information Technology Cost Category Ongoing OM&A Budget ($) Cost Category 2026/2027F Restated 2027/2028F Total Technology 2.14 2.10 Compensation 0.96 0.66 IT Application Software 0.89 0.81 Managed IT Servic...
AI summary The document presents a breakdown of the Operating, Maintenance and Administration (OM&A) costs for the Information Technology cost category. It provides a comparative budget for two fiscal periods: 2026/2027F Restated and 2027/2028F. The figures illustrate a projected decrease in total technology costs, primarily driven by a reduction in compensation and IT application software expenses, while managed IT services and other IT costs are projected to increase.
3.4.4 Communications & Stakeholder Engagement - IESO Nova Scotia is budgeting $0.94M in ongoing expenses as part of the Communications and - Stakeholder Engagement cost category. This cost category consists of costs incurred in respect - o...
AI summary IESO Nova Scotia has budgeted $0.94M in ongoing expenses for the Communications and Stakeholder Engagement cost category. These funds are intended to support public communications and stakeholder engagement activities, which are essential to the organization's strategic priority of building external trust and shaping energy policy for the benefit of Nova Scotians. The documentation includes a cost summary and comparison against the restated 2026/2027 forecast.
1 Figure 21: OM&A Costs for the Communications & Stakeholder Engagement Cost Category Ongoing OM&A Budget ($) Cost Category 2026/2027F Restated 2027/2028 Total Communications & Stakeholder Engagement 0.45 0.94 Compensation 0.28 0.25 Consul...
AI summary The document presents a cost breakdown for the 'Communications & Stakeholder Engagement' category within the Operating, Maintenance and Administration (OM&A) budget. It compares the restated forecast for 2026/2027 against the forecast for 2027/2028. The total budget for this category is projected to increase from $0.45 million to $0.94 million, with notable increases in spending for consulting and public education.
3.4.5 Legal & Regulatory - IESO Nova Scotia is budgeting $3.05M in ongoing costs as part of the Legal and Regulatory OM&A - cost category. This cost category primarily consists of the following subcategories and - associated costs: employe...
AI summary IESO Nova Scotia is budgeting $3.05 million for Legal and Regulatory Operating, Maintenance and Administration (OM&A) costs. These costs encompass employee compensation, Board of Directors governance, regulatory proceedings before the Nova Scotia Electricity Board (NSEB), internal regulatory fees, external legal advice for corporate leadership, and NERC/NPCC compliance. These expenditures are deemed necessary to achieve the organization's strategic priorities and fulfill regulatory functions.
1 Figure 22: OM&A Costs for the Legal and Regulatory Cost Category Ongoing OM&A Budget (S) Cost Category 2026/2027F Restated 2027/2028F Legal and Regulatory 2.37 3.05 Compensation 0.73 0.76 Governance 0.49 0.41 Regulatory Proceedings 0.55...
AI summary The document presents a breakdown of the Ongoing Operating, Maintenance and Administration (OM&A) budget specifically for the Legal and Regulatory cost category. It provides a comparative forecast for two fiscal periods: 2026/2027F Restated and 2027/2028F. Key cost components include Legal and Regulatory fees, Compensation, Governance, Regulatory Proceedings, Internal Regulatory Fees, and compliance fees related to NERC and NPCC standards.
1 3.4.6 Finance 2 IESO Nova Scotia is budgeting $1.03M in ongoing costs as part of the Finance cost category. This 3 cost category primarily consists of costs incurred in respect of financial services other than 4 insurance, which are cove...
AI summary IESO Nova Scotia is budgeting $1.03M for ongoing finance costs in the 2026/2027 forecast. These costs primarily relate to financial services, excluding insurance, which is categorized under Corporation Administration. The Corporation asserts that these finance costs are a foundational necessity for executing its strategic priorities. A provided figure summarizes the sub-categories of finance costs and compares them against the restated forecast.
8 Figure 23: OM&A Costs for the Finance Cost Category Ongoing OM&A Budget ($) Cost 2026/2027F 2027/2028 Category Restated Finance 0.96 1.03 Compensation 0.30 0.42 Interest Income - (0.03) Financing Costs 0.59 0.49 External Financial Audit...
AI summary The document presents a table outlining the projected Operating, Maintenance and Administration (OM&A) costs for the Finance cost category. It provides a comparative forecast for the 2026/2027 and 2027/2028 fiscal years, detailing specific expenditures including compensation, financing costs, external financial audits, and consulting services, as well as interest income.
3.4.7 Human Resources IESO Nova Scotia is budgeting $0.59M in ongoing costs as part of the Human Resources OM&A cost category. This cost category primarily consists of compensation for professional staff, recruitment fees, consulting and a...
AI summary IESO Nova Scotia is budgeting $0.59M for Human Resources as part of its Operating, Maintenance and Administration (OM&A) costs. These funds are designated for professional staff compensation, recruitment fees, consulting, and training and professional development. The expenditure is framed as essential for meeting the organization's strategic priorities, specifically the objective to build a strong organizational culture that supports employee growth and retention.
3 Figure 24: OM&A Costs for the Human Resources Cost Category Ongoing OM&A Budget ($) Cost Category 2026/2027F Restated 2027/2028 Human Resources 0.42 0.59 Compensation Consulting Recruitment 0.10 0.17 Training and Professional Development...
AI summary The document presents a table detailing the forecast Operating, Maintenance and Administration (OM&A) costs specifically for the Human Resources cost category. It provides a breakdown of expenditures for the 2026/2027F Restated and 2027/2028 periods, highlighting costs for recruitment, training and professional development, and other miscellaneous HR-related expenses.
4 3.4.8 Facilities 5 IESO Nova Scotia is budgeting $0.61M in costs as part of the Facilities OM&A cost category. This 6 cost category consists of the annual costs associated with IESO Nova Scotia's office space as 7 well as one month of op...
AI summary IESO Nova Scotia is budgeting $0.61M for the Facilities Operating, Maintenance and Administration (OM&A) cost category. These costs cover the annual expenses of IESO Nova Scotia's office space and one month of operating costs for the Phase 2 Control Centre. The expenditure is deemed necessary to fulfill strategic priorities, specifically the transition of system operations, and is compared against the restated 2026/2027 forecast.
12 Figure 25: OM&A Costs for the Facilities Cost Category Ongoing OM&A Budget (S) Cost Category 2026/2027F Restated 2027/2028 Facilities 0.38 0.61 Compensation - - Off ice Lease 0.38 0.35 Off ice Costs - 0.01 Building Operating Costs - - -...
AI summary The document presents a budgetary breakdown of Operating, Maintenance and Administration (OM&A) costs specifically for the Facilities cost category. It provides a comparative forecast for the 2026/2027 and 2027/2028 fiscal years, highlighting specific line items such as Office Lease and Office Costs, while noting that Compensation and Building Operating Costs are not included in this specific category's budget.
1 3.4.9 Corporate Services 2 IESO Nova Scotia is budgeting $1.53M in costs as part of the Corporate Services OM&A cost 3 category. This cost category primarily consists of various types of corporate expenses, including executive compensati...
AI summary IESO Nova Scotia is budgeting $1.53 million for Corporate Services as part of its Operating, Maintenance and Administration (OM&A) costs. This budget covers essential corporate expenses such as executive compensation, consulting, travel, insurance, memberships, and employee education. These expenditures are identified as necessary to support the organization's strategic priorities. The document also references a summary of Communications & Stakeholder Engagement costs in comparison to the restated 2026/2027 forecast.
9 Figure 26: OM&A Costs for the Corporate Services Cost Category A Budget Cost Category 2026/2027F Restated 2027/2028 Corporate Services 1.97 1.53 Compensation 25 Consulting Insurance 0.03 0.04 Membership, Subs, Education - 0.13 Other 0.16...
AI summary The document presents a budget comparison for Corporate Services OM&A costs for the 2026/2027F Restated and 2027/2028 periods. It breaks down costs into specific sub-categories, including Compensation, Consulting, Insurance, Membership, Subs, and Education, as well as an 'Other' category. The data indicates a projected decrease in total Corporate Services costs from 1.97 MS in the restated 2026/2027F budget to 1.53 MS in the 2027/2028 budget.
4 Comparison to 2026/2027 Budget - 5 This cost category decreased from IESO Nova Scotia's 2026/2027 Revenue Requirement - 6 Application due to a decrease in consulting costs as a result of the prior year budget including - 7 work for the p...
AI summary The text compares the current budget to the 2026/2027 Revenue Requirement, noting a decrease in consulting costs. This reduction is attributed to the completion of Phase 2 transition planning in the prior year. For the 2027/2028 fiscal year, Phase 2 transition work is being reclassified from Operating, Maintenance and Administration (OM&A) expenses to proposed capital work in progress. These savings are partially offset by incremental increases in other cost sub-categories.
10 3.5 2027 – 2030F Outlook - 11 Pursuant to the NSEB's direction in M12412, this section provides IESO Nova Scotia's three years - 12 of projected financial results. Figure 27 below provides 2027/2028F, 2028/2029F, and - 13 2029/2030F for...
AI summary IESO Nova Scotia provides a three-year financial outlook for the 2027–2030 period, including projected expenditures, amortization, and OM&A total costs. The company notes that as a newly established not-for-profit entity with less than a year of operational experience, the accuracy of outer-year forecasts is subject to change due to the lack of historical operational data.
19 Figure 27: 2027-2030F Outlook Category 2027/2028F Total Budget 2028/2029F Total Budget 2029/2030F Total Budget Proposed Expenditures $27.5 $6.7 $4.8 Revenue Requirement $15.23 $34.7 $37.6 Amortization $0.43 $4.7 $5.8 OM&A $14.8 $30.0 $3...
AI summary The document presents a financial outlook for the 2027-2030 forecast period, specifically highlighting the budget categories for Proposed Expenditures, Revenue Requirement, Amortization, and Operating, Maintenance and Administration (OM&A) costs. The data shows a significant increase in the Revenue Requirement and OM&A costs from 2027/2028F to 2029/2030F, while Proposed Expenditures are projected to decrease significantly over the same period.
4.2 OM&A and Amortization - Consistent with section 29 of the MAEA, IESO Nova Scotia's revenue requirement represents the - costs necessary to carry out its statutory mandate and forms the basis for recovery through the - proposed Fee Reco...
AI summary The text outlines the components of IESO Nova Scotia's revenue requirement under the More Access to Energy Act (MAEA). It specifies that the revenue requirement consists of Operating, Maintenance and Administration (OM&A) costs and amortization expenses for capital assets. These costs are eligible for recovery through the proposed Fee Recovery Mechanism. Specifically, the OM&A reflects ongoing operational costs for the 12-month application period, while amortization includes costs for Control Centre assets and various IT assets.
4.3 Net Revenue Requirement Deferral and Variance Account - IESO Nova Scotia seeks approval of its 2025/2026 fiscal year variance by way of the net Revenue - Requirement Deferral and Variance Mechanism (DVM). Notwithstanding the fact NSEB...
AI summary IESO Nova Scotia is seeking approval for its 2025/2026 fiscal year variance using the Net Revenue Requirement Deferral and Variance Mechanism (DVM). Although DVM approval is pending under a separate proceeding (M12663), the variance calculation remains consistent with the OM&A Deferral and Variance Account. The DVM is designed to track differences between forecasted and actual revenue requirements—including OM&A and amortization—to ensure market participants pay amounts reflecting actual costs through future true-up fee adjustments.
10 Figure 30 - 2025-2026 Forecast to Actual Cost Variance 2025-26 Revenue Application Actual 2025-26 Actual Over/(Under) Revenue Application $ Actual Over/(Under) Revenue Application % Administration Salaries and Wages $1,572,751 $1,047,76...
AI summary The document presents a variance analysis between the 2025-26 Revenue Application and the actual costs incurred for the same period. While total expenses were approximately $237,310 lower than forecasted (a 3.0% variance), specific categories showed significant deviations. Notably, Administration Salaries and Wages were 33.4% under budget, and NS Power Employee Transfers and IRP Consulting were 49.9% under budget. Conversely, Transition and Operational Planning costs were 74.4% over the forecast. The net revenue requirement versus actual expense showed a 6.5% under-spend.
4.4 Fee Calculation for Fiscal Year 2027/2028 - IESO Nova Scotia's fees for fiscal year 2027/2028 have been calculated based on the revenue - requirements described above in this Application. Namely, the OM&A and amortization expense - of...
AI summary IESO Nova Scotia has calculated its fees for fiscal year 2027/2028 based on revenue requirements, specifically OM&A and amortization expenses totaling $15.19M. The calculations were performed by Power Advisory using a model derived from the Fee Recovery Mechanism application (M13007). Because a final decision on M13007 is pending, IESO Nova Scotia provided fee calculations for Load Serving Entities based on two different True-Up Options.
Measurement and Useful Life Property, plant and equipment are recorded at cost less accumulated depreciation. Cost includes the purchase price, plus any additional costs directly attributable to the construction of the asset and preparing...
AI summary The text outlines the accounting treatment for property, plant, and equipment (PP&E). Assets are recorded at cost, including purchase price, construction costs (materials, payroll, consulting, borrowing), and asset retirement costs. Construction in progress is tracked until completion, at which point it is transferred to the appropriate category. Maintenance costs that do not extend asset life are expensed. Depreciation is calculated using the straight-line method over estimated useful lives, with annual reviews of these parameters.
Purpose The purpose of this policy is to establish the accounting principles for the recognition, measurement, presentation, and disclosure of employee benefits in accordance with International Financial Reporting Standards (IFRS), specifi...
AI summary The document outlines the purpose of a policy designed to establish accounting principles for employee benefits. It specifies that the policy must align with International Financial Reporting Standards (IFRS), specifically IAS 19 – Employee Benefits. The objective is to ensure consistent and appropriate recognition, measurement, presentation, and disclosure of obligations resulting from services provided by employees.
Scope This policy applies to all employee benefits provided by IESO Nova Scotia, including: - Short-term employee benefits such as paid annual leave and paid sick leave; and - Post-employment benefits in the form of a registered defined co...
AI summary The document defines the scope of the employee benefits policy for IESO Nova Scotia. It specifies that the policy covers short-term benefits, including paid annual leave and paid sick leave, as well as post-employment benefits provided through a registered defined contribution pension plan. It explicitly clarifies that IESO Nova Scotia does not provide defined benefit pension plans or any other long-term or termination benefits outside of these specific provisions.
Short-Term Employee Benefits Paid Annual Leave Paid annual leave is classified as a short-term employee benefit. - The cost of paid annual leave is recognized as an expense as employees render service that increases their entitlement to fu...
AI summary The document defines the accounting treatment for short-term employee benefits, specifically paid annual leave. It establishes that the cost of such leave is recognized as an expense as employees provide services that increase their entitlements. Additionally, it specifies that a liability must be recognized for the expected cost of unused accumulated leave at the reporting date, measured at the undiscounted amount expected to be paid upon settlement.
Post-Employment Benefits Defined Contribution Pension Plan - IESO Nova Scotia sponsors a registered defined contribution pension plan, which is classified as a post-employment benefit under IAS 19. - IESO Nova Scotia's obligation is limite...
AI summary The text outlines the accounting treatment for IESO Nova Scotia's registered defined contribution pension plan, which is classified as a post-employment benefit under IAS 19. The entity's obligation is restricted to making fixed contributions as per the plan terms. Pension expenses are recognized in the profit or loss statement during the period employees provide service. Liabilities are recognized for unpaid contributions at the reporting date, while prepaid contributions are recognized as assets if they allow for cash refunds or future payment reductions.
Presentation and Disclosure Employee benefit expenses are presented within operating expenses in the statement of profit or loss. Liabilities for accrued employee benefits are classified as current liabilities unless settlement is not expe...
AI summary The text outlines the accounting treatment and disclosure requirements for employee benefit expenses. Employee benefit expenses are included in operating expenses within the statement of profit or loss. Liabilities for these benefits are classified as current unless settlement is expected beyond twelve months. The disclosures comply with International Accounting Standards IAS 19 and IAS 1, ensuring users can understand the nature and financial impact of these benefits.
Procurement Policy The procurement policy establishes a framework for the acquisition of goods, services, including consulting and technology spend by defining procurement principles, approval authorities, budget requirements, and decision...
AI summary The document introduces the procurement policy, which serves as a framework for acquiring goods and services, specifically highlighting consulting and technology expenditures. The policy defines core procurement principles, approval authorities, budget requirements, and decision-making processes. It also incorporates embedded control activities to ensure oversight and compliance within the procurement lifecycle.
Detective controls - Finance department monitors compliance with the policy to detect any inappropriate approvals, non-competitive purchases or budget overruns to enable corrective actions before issues escalate. - AP aging review Finance...
AI summary The document outlines the detective controls implemented by the Finance department to ensure regulatory and internal policy compliance. These controls are designed to identify issues such as inappropriate approvals, non-competitive purchases, and budget overruns before they escalate. Specific procedures mentioned include the review of accounts payable (AP) aging and monthly spend versus budget analyses to facilitate timely corrective actions.
Payroll Procedures Payroll procedures are in place to ensure accuracy and segregation of duties to prevent unauthorized spending. Control activities include:
AI summary The document introduces the payroll procedures established to maintain financial integrity. These procedures are designed to ensure the accuracy of payroll processing and to enforce a clear segregation of duties, which serves as a primary internal control to prevent unauthorized spending within the organization.
Why it matters: - Achieves the long-term "North Star" operating model and long-term customer benefits - Postpones enhancement capex, allowing design l o be based on real operation;:il experiences, including seeing full functionality of NSP...
AI summary IBM recommends that IESO-NS adopt 'Scenario 4 – Enhanced Independence' as the preferred operating model for Phase 2 of the transition to independent operational control. This move aligns with the More Access to Energy Act (MAEA) and aims to achieve long-term system value and reliability. The proposed phased implementation (2A, 2B, and 2C) is estimated to cost $75 million in capital over five years, with an expected net present value of $219 million and significant annual benefits starting in 2028/29.
9.Cost Summary The Phase 2 program is estimated at $75 million over a five-year implementation period. The cost summary is as follows: - Total Capital Cost: $75 million - Incremental Operating Cost: approximately $6.3 million per year Phas...
AI summary The document provides a cost summary for the Phase 2 program, which is estimated to cost $75 million over a five-year implementation period. The program is divided into three phases: Phase 2A ($40.9 million capital cost), Phase 2B ($8 million capital cost), and Phase 2C ($26 million capital cost). Phase 2C is noted to provide expected additional benefits of approximately $20 million per year upon completion. Incremental operating costs for the total program are estimated at $6.3 million annually.
The estimated program costs are summarized in Fig 11 below, illustrating both the total investment and the allocation across each implementation phase. (All costs in $M) Total IT Costs $ 20.7 Program Integration $ 11.3 Control Center Build...
AI summary The document provides a detailed financial breakdown of estimated program costs for Phase 2 implementation, categorized into capital expenditures (Capex) and operating expenses (Opex). It outlines specific costs for IT, program integration, control center construction, NERC compliance, and cybersecurity. The summary includes a 'Mid Case' total Capex of $75.4M, with low and high case variations, and allocates these costs across three distinct implementation phases (Phase 2A, 2B, and 2C).
1. IT Costs: - Description: Assumes the configuration of shared platforms (EMS, etc.), transferred platforms, communications, interfaces, and other IT tools. This includes shared or partitioned EMS and SCADA environments, telemetry, and hi...
AI summary The document outlines the basis for estimating Information Technology (IT) costs associated with the IESO-NS project. It covers the configuration of shared and exclusive platforms, including EMS, SCADA environments, telemetry, and historian systems. The text emphasizes that shared systems with Nova Scotia Power (NSP) are preferred for ratepayer benefit. Cost estimates are derived from a combination of vendor quotes, NSP internal estimates, industry benchmarks, and historical project data.
6. NSP Support Costs: - Description: Includes internal Nova Scotia Power effort supporting transition, handover, and system readiness. This reflects the effort required from Nova Scotia Power to support the transfer or shared operation of...
AI summary Nova Scotia Power (NSP) identifies 'NSP Support Costs' as a category covering the internal efforts required to facilitate the transition, handover, and system readiness for shared operations with IESO-NS. These costs specifically account for the transfer of systems and knowledge during implementation. The estimates for these costs are provided directly by Nova Scotia Power.
7. Other: - Description: Covers internal IESO-NS effort, software licenses, third-party vendor costs for systems to be transferred/shared, training, and miscellaneous implementation items. This category captures costs that do not fall with...
AI summary This section describes 'Other' costs associated with the Phase 2 implementation of the IESO-NS system. These costs include internal efforts, software licenses, third-party vendor expenses for system transfers or sharing, training, and miscellaneous implementation items not captured in other categories. The estimates for these costs are based on a combination of vendor quotes, industry benchmarks, and professional judgment.
8. Contingency (15%): - Description: A 15% contingency is applied to direct capital to absorb estimate variation within the expected Class 3 range. Contingency is applied to direct capital costs only and does not apply to Opex or Capitaliz...
AI summary The document outlines a 15% contingency applied to direct capital costs to account for estimate variations within the expected Class 3 range. This contingency is specifically excluded from operating expenses (OPEX) and capitalized interest. The basis for this 15% contingency is grounded in standard industry practice for Class 3 estimates, utilizing professional judgment and established industry standards.
11. Opex Items: - Description: Includes incremental annual operating costs such as staffing, system operating costs, NERC compliance, training, and telecommunications. This reflects the ongoing annual operating costs required to sustain IE...
AI summary The document outlines the estimated annual operating expenses (OPEX) for IESO-NS's independent operations, totaling approximately $75 million. These costs cover staffing, system operations, NERC compliance, training, and telecommunications. The estimates are based on professional judgment and industry benchmarks, categorized as Class 3 accuracy (-15% to +20%). The text justifies the $64 million to $90 million range as reasonable for a large-scale operational transformation involving complex systems and governance development.
9.1. Cost Estimation Method and Assumptions The cost estimates for the Phase 2 program have been developed as a Class 3 Budgetary Estimate as defined by AACE standards. This indicates an estimate developed at a level appropriate for strate...
AI summary The document outlines the methodology and assumptions for the Phase 2 program's cost estimates, which are classified as Class 3 Budgetary Estimates according to AACE standards. These estimates are intended for strategic decision-making and program approval rather than final execution, with an expected accuracy range of -15% to +20%. Key assumptions include a 2026 commencement date, a 15% capital contingency, approximately $6.3 million in annual operating costs, and a phased benefit realization schedule validated against benchmarks like the Ontario IESO model.
Labour Market Risk Skilled power system operators and engineers are in high demand across the electricity sector. Recruitment timelines and compensation requirements may vary from current assumptions.
AI summary The document highlights risks associated with the labor market within the electricity sector. It notes that skilled power system operators and engineers are in high demand, which may lead to recruitment timelines and compensation requirements that differ from the current project assumptions.
Benchmarking the roles, responsibilities and operating costs of an ISO ES.8 In Chapter 2 of our report, we compare IESO-NS with a benchmarking group of ISOs in other regions. No existing ISO is entirely comparable with IESO-NS in its curre...
AI summary The report benchmarks the IESO-NS against other Independent System Operators (ISOs) to determine reasonable operating costs and roles. It establishes a general minimum fixed operating cost of $70-140 million per year for ISOs. The analysis highlights that many ISO costs are non-incremental, as they replace functions previously performed by Vertically Integrated Utilities (VIUs) or Transmission System Operators (TSOs). Furthermore, the report notes that cost scaling is not strictly linear with grid size but depends on specific roles, such as wholesale energy and capacity markets.
ial improvements in the control room may result in improved operational decisions – these improved operations may further advance Phase 1 benefits due to enhanced information quality and availability. - ES.12 In Figure ES-2 below we map ho...
AI summary The text discusses the anticipated benefits and costs of transitioning from a Vertically Integrated Utility (VIU) model to an Independent System Operator (ISO) model in Nova Scotia. Key benefits include improved operational decisions, reliability, and environmental gains through enhanced information quality. However, the transition involves one-off implementation costs, incremental operating expenses due to corporate duplication, and a potential loss of synergies between the system planner and operator during the initial phase.
2. Benchmarking the roles, responsibilities and operating costs of an ISO - 2.1 The objective of this chapter is three-fold: (1) benchmarking IESO-NS among its peers globally; (2) understanding from that benchmark what the typical roles an...
AI summary This chapter outlines the methodology for benchmarking the IESO-NS against global peers to determine typical Independent System Operator (ISO) roles, responsibilities, and operating costs. It acknowledges that while no direct comparable benchmark exists for IESO-NS, a range of international ISOs with shared characteristics will be analyzed. The study aims to identify key cost drivers and map operating costs against metrics like population served and installed capacity, noting that findings are illustrative due to diverse global differences.
Unit CAISO ISO-NE MISO AESO IESO Ontario NESO EirGrid AEMO EMA Trans- power Nova Scotia Approximate people served millions 32 15 45 5 15 67 5 23 6 5 1 Transmission km 41,800 14,500 127,100 26,000 30,000 35,900 6,700 40,000 2,600 11,000 5,2...
AI summary The document provides a comparative overview of major electricity transmission system operators and independent system operators (ISOs) across different regions, including CAISO, ISO-NE, MISO, AESO, IESO Ontario, NESO, EirGrid, AEMO, EMA, Trans-power, and Nova Scotia. It tabulates key metrics such as population served, transmission infrastructure length, installed capacity, peak load, total energy consumption, employee counts, ownership structures, and operating costs. The data highlights the scale and operational scope of these entities as of 2024-2025.
Operating costs - 2.22 In this section, we compare and discuss major operating costs of the benchmarking group. These fall generally into the major categories of salaries and benefits; outside services; facility, equipment, various IT and...
AI summary The text analyzes the operating costs of various Independent System Operators (ISOs) and Transmission System Operators (TSOs) as part of a benchmarking exercise. It identifies key cost drivers including salaries, benefits, outside services, and IT/office expenses. Notably, Transpower's high operating costs are attributed to its dual role as both an ISO and a significant transmission asset owner. The analysis distinguishes between incremental ISO costs, transferred utility costs, and excluded costs such as system service procurement, regulatory fees, and non-recurring transition costs.
ISO-NE MISO AESO IESO Ontario NESO Transpower Year 2024 2024 2024 2023 FY2025 FY2025 $m USD Salaries and related benefits 154 243 70 129 153 68 Outside services 25 81 7 15 79 7 Facility and equipment costs 4 19 4 19 Hardware, software main...
AI summary The document provides a comparative analysis of operating costs for several regional transmission system operators and independent system operators, including ISO-NE, MISO, AESO, IESO Ontario, NESO, and Transpower. It details line items such as salaries, outside services, depreciation, and maintenance. Crucially, it provides a scaled estimate of these operating costs adjusted to the size of Nova Scotia's grid, alongside cost metrics like OpEx per TWh and notes regarding regulatory fees and transition costs.
Peak Load against operating costs <sup>50 Sources same as Table 2-3.
AI summary The provided text is a heading and a brief reference note indicating that the source for the data in 'Peak Load against operating costs' is the same as Table 2-3. It does not contain specific arguments, data, or analysis.
Table 3-2: Phase 2 benefits and underlying levers Direct benefits from Phase 2 Scheduler, residual energy system balancer and settlement Indirect benefits on Phase 1 roles from Phase 2 Long-term security of supply Transmission planner Scal...
AI summary Table 3-2 outlines the benefits and levers associated with 'Phase 2' of a project, categorized into direct benefits, indirect benefits on Phase 1 roles, and the scaling of Phase 1 benefits. Key benefits include improved operational efficiency leading to decreased production and avoided carbon costs, as well as increased innovation and diversity through reduced capital expenditures (CapEx). Additionally, the phase is expected to foster increased competition by facilitating greater entry into competitive procurement processes.
Phase 1 incremental costs - 3.21 It must be acknowledged that certain costs are inherent to a transition of certain tasks from a VIU to an ISO. While many costs are likely to be comparable, e.g., many computing and software costs, some are...
AI summary The text discusses the incremental costs and potential disbenefits associated with transitioning certain tasks from a Variable Independent Utility (VIU) to an Independent System Operator (ISO) in Nova Scotia. Key issues include one-off upfront costs like real estate, duplicate software licenses, and redundant corporate functions. Furthermore, the analysis highlights a potential loss of synergies if Phase 1 is implemented without Phase 2, as separating the planner and operator roles may hinder efficient investment decisions and increase transaction costs due to reduced operational expertise in planning.
Phase 2 incremental costs - 3.25 Much of the cost for Phase 2 falls into the same broad categories as Phase 1, but to a larger magnitude for one-off costs associated with the control room and other capital-intensive activities. The impleme...
AI summary The text analyzes the incremental costs associated with Phase 2 of a system operator transition, noting that costs are largely similar to Phase 1 but higher due to one-off capital-intensive activities like control room modernization. It highlights a tension between restored planning and operator synergies and the potential loss of operational synergies caused by unbundling asset ownership from operation. Specifically, unbundling may lead to increased transaction costs for activities like temporary line overloading due to information gaps and negotiation requirements.
d inflation rate. The 2% inflation rate was sourced from NSP's IRP, while the 6.65% WACC was taken from NSP's 2024 WACC and AFUDC Rates for 2025 Application (Matter No. 11990, approved 31 May 2025). 66 A third category of NSP-built generat...
AI summary The text outlines the methodology for analyzing various cost categories for Nova Scotia's electricity system between 2026 and 2050. It specifies the use of a 2% inflation rate and a 6.65% WACC from NSP's 2024 application. Key categories discussed include Transmission CapEx (annualized over asset life), Production costs (variable costs like fuel, excluding capital), and Carbon emissions value (calculated based on carbon tax, policy exemptions, and the federal carbon price). It also notes that certain NSP-built generation CapEx is excluded due to its stable nature during the IESO transition.
(5) Loss of synergies from planner and operator 4.36 Prior to the IESO, the planner and operator functions were combined under NSP. Separating these functions – if Phase 1 only was implemented - can conceivably create additional transactio...
AI summary The document discusses the potential negative impacts of separating the planner and operator functions, which were previously combined under Nova Scotia Power (NSP). The separation may create additional transaction costs and obstruct information flows due to the loss of inherent system knowledge. These factors are expected to increase production costs by 1-2% starting in 2029, as real-time operational constraints may no longer align with long-term planning.
(6) Direct control room improvements - 4.40 The transfer of system operations from NSP to the IESO is expected to coincide with a significant modernization of the current dispatch process. [78](#page-72-1) Updates to operational assets and...
AI summary The text discusses the expected operational improvements resulting from the transfer of system operations from Nova Scotia Power (NSP) to the Independent Electricity System Operator (IESO). It argues that the IESO's core focus on system operation will drive modernization of control room hardware and software, leading to more efficient resource utilization and reduced production costs. These improvements are projected to yield 2-10% in savings starting in 2029, surpassing the expected benefits of current improvements being implemented by NSP.
(12) Loss of synergies between asset owner and operator (disbenefit) 4.58 The separation of asset ownership and operation creates some lost synergies, as explained in Chapter 3. This is due to the change to a contractual interface (in whic...
AI summary The document discusses the potential disbenefit of lost synergies resulting from the separation of asset ownership and operation. Transitioning from an operational interface to a contractual one is expected to create friction, leading to increased transaction and information-sharing costs. These factors are projected to cause a slight increase in production costs, estimated between 0.5% and 1%, starting in 2027 when Phase 2 begins.
Avoided professional services costs A1.24 Some professional services costs may be avoided with an ISO. For instance, the government can avoid direct hire of consultants if it can rely on ISO expertise, or reduce the amount of auditing and...
AI summary The text discusses the potential for cost savings and improved administrative efficiency through the use of an Independent System Operator (ISO). Key benefits include the avoidance of direct consultant hiring by the government, reduced auditing and investigation costs for policing a Variable Independent Utility (VIU), and a decreased regulatory burden on the board. Additionally, an ISO can provide more consistent advisory support, potentially enhancing the quality of advice while reducing overall labor costs.
Phase 1, as well as incremental costs of implementation. Phase 2 core roles: more efficient operations from control room improvements Scheduler, residual energy system balancer, and settlement - A1.28 In contrast to the more obvious confli...
AI summary The text analyzes the potential conflicts of interest arising from Nova Scotia Power (NSP) acting as both a system operator and an asset owner. While operational expenditures (OpEx) are generally recovered without an additional rate of return, potentially limiting direct financial upside, there is a concern that NSP could favor its own assets during scheduling decisions. Despite functional separation and UARB-approved standards of conduct, a lack of transparency in day-to-day operational decisions may lead to perceptions of bias against independent power producers (IPPs).
Table A1-1 Benefits and cost categorisation IESO Nova Scotia Role Outcome Benefits (🌼 y quantified in Chapter 4, and corresponding benefit number) CORE Transmission planner and long-term security of supply ■ Reduced risks borne by consumer...
AI summary The document outlines the benefits and costs associated with the roles of IESO Nova Scotia across various phases. Key benefits include reduced risks of cost overruns for consumers, more efficient transmission and resource investment, and improved system expertise. It highlights 'Key Levers' such as timeliness, removal of perceived bias, and increased innovation. Conversely, it identifies costs related to the implementation of separation, additional staffing, reduced decision-making efficiency, and potential loss of synergies and increased transaction costs between asset owners and operators.
g which the Board ordered NSPI to pay an administrative penalty of $1 million to promote future compliance with the established performance standards and targets. This penalty was credited to the FAM; - Working closely with NSPI to continu...
AI summary The Consumer Advocate (CA) outlines its ongoing regulatory activities and advocacy roles for various ratepayer groups. Key activities include monitoring Nova Scotia Power Inc.'s (NSPI) collection processes for low-income customers, addressing residential impacts from a 2025 cyber incident, and reviewing programs by Efficiency One (E1). The CA also represents interests regarding the Nova Scotia Independent Energy System Operator (NSIESO), Eastward Energy's deferral accounts (CRP and RDA), and the Halifax Regional Water Commission's (HRWC) general rate application.
Appendix A Sum of Sum of Sum of Sum of Sum of Sum of Sum of Sum of Sum of PL Consultant Consultant Consultant Consultant Consultant Consultant Consultant Consultant SUM OF Company Hours Sum of PL Fees Sum of PL Costs Sum of PL Tax Sum of P...
AI summary The document provides an appendix table detailing professional fees and costs associated with various entities involved in the regulatory proceeding. It quantifies the hours worked, fees (in USD and CAD), and associated costs for organizations including Nova Scotia Power Incorporated, EfficiencyOne, Halifax Regional Water Commission, and IESO Nova Scotia, among others. The table serves as a financial record of consultancy and service expenditures related to the proceeding.
Small Business Advocate Company Total Hours for SBA and Consultants Sum of Fees for SBA Sum of Costs for SBA Sum of HST for SBA Total Sum for SBA Sum of Fees for Consultants (USD) Sum of Costs for Consultants (USD) Total Sum for Consultant...
AI summary The document provides a detailed breakdown of the Small Business Advocate's (SBA) professional activities and associated costs across multiple regulatory proceedings. It lists specific tasks performed, including reviewing Board decisions, responding to Information Requests (IRs), attending court appearances, and conducting expert consultations. The data tracks hours spent, fees, and costs for both the SBA and external consultants for matters such as the DNRR Community Solar PPA, Property & Assets Action Plan, Port Hawkesbury Paper Application, PHP Judicial Review, FAM SWG, and the Cost of Service Study.
(i) Unit# S.F. 1 Net Operating Term Term Monthly Rent/s.f. Cost/s.f. Begin End Rent Payment (2025 Budget) 2 (Including 14% HST) Suite 1010 8,900 $22.75 $15.21 1-Oct-26 31-Dec-26 $32,095.18 $23.21 TBD 1-Oct-27 31-Dec-27 TBD $23.67 TBD 1-Oct...
AI summary The text presents a table detailing the lease terms for Suite 1010, including square footage (8,900 sq. ft.), net rent per square foot, and the 2025 budget cost per square foot. It outlines a multi-year rent schedule from October 2026 through December 2035, with specific monthly rent payments for the 2026 term. A note indicates that the square footage is subject to verification by an expert using BOMA standards.
5.2 Defined Terms - Operating Cost and Taxes. For the purpose of calculating the Proportionate Share of Operating Cost and Taxes attributable to the Premises: "Fiscal Year" means a calendar year provided that the Landlord may from time to...
AI summary This section defines the terms 'Fiscal Year' and 'Operating Costs and Taxes' for the purposes of calculating a tenant's proportionate share of costs. Operating Costs and Taxes include expenses for building operation, management, maintenance, administration, repair, taxes, and insurance. It specifically includes a 5% property management fee based on gross revenue but excludes costs recoverable from tenants, debt service, depreciation, lease procurement costs, personal taxes of the Landlord, and costs arising from original construction defects.
5.4 Annual Statement of Operating Costs, Taxes, Etc. After the end of the period for which the estimated payments have been made, the Landlord shall issue the Tenant a statement (the "Statement") setting out in detail the Proportionate Sha...
AI summary This section outlines the procedures for the annual reconciliation of operating costs, taxes, and other recurring or variable rent items between a Landlord and a Tenant. It specifies that the Landlord must issue a detailed Statement after the fiscal year ends. The Tenant has the right to audit the Landlord's books and dispute the Statement through an independent Expert. It also establishes timelines for dispute notices, error readjustments, and the application of interest on any resulting payment differences.
6.1 Operation and Management. The Landlord shall operate and manage the Building, the Common Areas, and the Common Service Areas. Landlord will provide, by operation of the heating or air-conditioning system between the hours of 8:00 A.M....
AI summary This section outlines the operational and management responsibilities of the Landlord regarding the Building, Common Areas, and Common Service Areas. It specifies the Landlord's obligation to provide filtered, temperature-controlled air during business hours, subject to specific temperature thresholds based on exterior conditions. The Landlord's obligations are contingent upon the Tenant's compliance with conditions, including keeping windows closed, limiting electrical energy consumption by lights and machines to 2 watts per square foot, and adhering to specific occupancy limits.