Topic:"Performance Monitoring" in M03683

Matter: P-141 - Nova Scotia Power Inc. - Request Approval of the 2011 Annually Adjusted Rates (AAR's)Request approval of 2011 Annually Adjusted Rates: 1) Load Following (LF) portion of the GRLF Tariff; 2) One Part Real Time Price (1P-RTP) Fixed Cost Adders; 3) Wholesale Market Back-Up/Top-up (BUTU) Tariff; 4) Wholesale Market Non-Dispatchable Supplier Spill (Spill) Tariff
6 passages 2 documents

Performance Monitoring across all matters →

N-1NSPI Redacted 2011 Annually Adjusted Rates 11/5/2010 3 passages
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF p. p. 0
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF - (2) The backup supply of power will be on a best efforts basis where the customer's generation equipment is removed from service due to scheduled maintenance, forced outage, or loss of fue...

AI summary The Generation Replacement and Load Following Tariff outlines backup power supply on a best-efforts basis during customer equipment outages, withdrawal conditions via the Interruptible Rider, load following adjustments for process limitations, and customer responsibility for approved metering equipment costs.

SPECIAL CONDITIONS: p. p. 0
SPECIAL CONDITIONS: - (1) The Company reserves the right to have a separate service agreement, if in the opinion of the Company issues not specifically set out herein, must be addressed for the ongoing benefit of the Company and its custom...

AI summary The document outlines special conditions imposed by Nova Scotia Utility on customers, including rights to separate service agreements, customer obligations to maintain system integrity, and requirements for operating agreements. The company retains control over metering locations and service requirements beyond basic transformation. Factors like reliability, harmonic levels, and stability are considered in assessing system integrity.

ONE PART EXTRA HIGH VOLTAGE REAL TIME PRICING TARIFF p. p. 27
ONE PART EXTRA HIGH VOLTAGE REAL TIME PRICING TARIFF The actual price charged for each hour will be final twenty minutes prior to the commencement of that hour. - (2) Metering will normally be at the low voltage side of the transformer. Sh...

AI summary The One Part Extra High Voltage Real Time Pricing Tariff outlines hourly pricing finalized 20 minutes prior to the hour, metering requirements (including capital contributions for primary metering), transformer loss adjustments, a 12-month minimum service term, and conditions for switching between firm and interruptible service. NSPI enforces power factor maintenance and service renewal terms.

N-2Refiled 2011 Annually Adjusted Rates (AAR's) 12/8/2010 3 passages
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF p. p. 0
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF - (2) The backup supply of power will be on a best efforts basis where the customer's generation equipment is removed from service due to scheduled maintenance, forced outage, or loss of fue...

AI summary The Generation Replacement and Load Following Tariff outlines backup power provisions on a best-efforts basis during equipment outages, supply withdrawal criteria linked to the Interruptible Rider, load-following adjustments based on customer process limitations, and customer responsibility for approved metering equipment. NSP oversees implementation.

WHOLESALE MARKET BACKUP/TOP-UP SERVICE TARIFF p. p. 53
WHOLESALE MARKET BACKUP/TOP-UP SERVICE TARIFF The tariff is available to wholesale customers as defined in section 2(b) of the Electricity Act, Chapter 25 of the Acts of 2004. " (b) "wholesale customer" means Nova Scotia Power Incorporated...

AI summary The Wholesale Market Backup/Top-Up Service Tariff applies to wholesale customers under the Electricity Act, requiring written notice, annual applications by January 31, and metering equipment approved by NSPI. Third-party generators bear installation costs, and service is renewable annually for 12 months.

AVAILABILITY: p. p. 53
AVAILABILITY: This tariff is available for use by independent non-dispatchable electric generators serving customers taking service under the Wholesale Market Backup\top-up Service tariff. The tariff is applicable to scheduled "spill energ...

AI summary This tariff applies to independent non-dispatchable generators supplying wholesale customers under the Backup/top-up Service tariff. It defines 'spill energy' as excess scheduled production, limits compensation to approved Maximum Spill Capacity, and mandates supplier-installed metering approved by NSPI. The tariff was approved by the Nova Scotia Utility and Review Board on January 1, 2011.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →