GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF - (2) The backup supply of power will be on a best efforts basis where the customer's generation equipment is removed from service due to scheduled maintenance, forced outage, or loss of fue...
AI summary The Generation Replacement and Load Following Tariff outlines backup power supply on a best-efforts basis during customer equipment outages, withdrawal conditions via the Interruptible Rider, load following adjustments for process limitations, and customer responsibility for approved metering equipment costs.
SPECIAL CONDITIONS: - (1) The Company reserves the right to have a separate service agreement, if in the opinion of the Company issues not specifically set out herein, must be addressed for the ongoing benefit of the Company and its custom...
AI summary The document outlines special conditions imposed by Nova Scotia Utility on customers, including rights to separate service agreements, customer obligations to maintain system integrity, and requirements for operating agreements. The company retains control over metering locations and service requirements beyond basic transformation. Factors like reliability, harmonic levels, and stability are considered in assessing system integrity.
ONE PART EXTRA HIGH VOLTAGE REAL TIME PRICING TARIFF The actual price charged for each hour will be final twenty minutes prior to the commencement of that hour. - (2) Metering will normally be at the low voltage side of the transformer. Sh...
AI summary The One Part Extra High Voltage Real Time Pricing Tariff outlines hourly pricing finalized 20 minutes prior to the hour, metering requirements (including capital contributions for primary metering), transformer loss adjustments, a 12-month minimum service term, and conditions for switching between firm and interruptible service. NSPI enforces power factor maintenance and service renewal terms.