RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-133: Please provide the actual periods each of NSPI's eight coal-fired units were down for planned maintenance in each of the years 2001 through 2006? Response IR-133:...

AI summary In response to Information Request IR-133, the Nova Scotia Utility and Review Board (SEB) directs Nova Scotia Power Incorporated (NSPI) to refer to a confidential attachment regarding the specific periods coal-fired units were down for planned maintenance between 2001 and 2006.

N-52N-52.pdf 1 passage
Nancy McNeil - Re: Clayton Park Outage - Oct 12th
rom customers as to the location of the problem, we were able to find it quickly. This was still challenging as traffic was heavy in the areas where we had to patrol due to the lack of traffic lights. Crews located the problem - a pin insu...

AI summary A power outage on Langbrae Drive was caused by a cracked pin insulator, which led to a flash and subsequent power interruption. The insulator's failure was exacerbated by damp weather. The issue was identified by burn marks on the pole and could not have been detected during routine feeder inspections.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →