Section 47
1 Due to the recent (February 2022) forced outage at Brooklyn Power (Section 3.2.3), coupled with 2 the Wreck Cove LEM project scheduled outages and ongoing commissioning work on the 3 Labrador Island Link, Lingan Unit 2 will be available,...

AI summary Due to recent outages and maintenance at Brooklyn Power and the Wreck Cove LEM project, Lingan Unit 2 will be available to provide firm capacity for the 2022/2023 winter. NS Power has applied to the NSUARB for approval of the accounting treatment of the Annapolis Tidal Generating Station's unrecovered net book value, but the NSUARB has held the application in abeyance and requested a decommissioning application.

Section 105
m to demonstrate that the loss of load expectation (LOLE) of disconnecting 26 firm load due to resource deficiencies is, on average, no more than 0.1 days per 27 year. [This evaluation shall] make due allowances for demand uncertainty, 28...

AI summary The document discusses the evaluation of the loss of load expectation (LOLE) when firm load is disconnected due to resource deficiencies, requiring no more than 0.1 days per year on average. It also mentions spinning reserve requirements and references the North American Electric Reliability Corporation (NPCC) for regional criteria.

Section 110
1 be 11 to 9 percent. In the 2020 IRP, the Company used 10 percent for the ELCC value of new 2 wind. For the purposes of this Report, NS Power has used the 18 percent capacity value of existing 3 wind to account for the wind farm serving w...

AI summary The document discusses the capacity value assigned to different wind and hydro resources by NS Power, referencing the 2020 Integrated Resource Plan (IRP) and the Back-up / Top-up (BUTU) Tariff. It also outlines a projected capacity deficit in Winter 2023/2024 and mentions the Planning Reserve Margin (PRM) as a reliability criterion set by the North American Electric Reliability Corporation (NPCC).

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →