eduled outages, Lingan Unit 2 will be available, if needed, 18 to provide firm capacity and maintain an adequate planning reserve margin (Section 6.2) for the 19 upcoming winter (2023/2024). 20 DATE FILED: June 30, 2023 Page 17 of 59 2023...
AI summary The document discusses the availability of Lingan Unit 2 for providing firm capacity and maintaining an adequate planning reserve margin during the upcoming winter (2023/2024). It references the 2023 10-Year System Outlook, filed on June 30, 2023.
Page 41 of 59 2023 10-Year System Outlook NON-CONFIDENTIAL 1 The Ten-Minute Reserve Responsibility for NS Power is typically 32 MW 41 of spinning reserve 2 on the system. Additional regulating reserve is maintained to manage the variabilit...
AI summary The document outlines the Ten-Minute Reserve Responsibility for NS Power, which is 32 MW of spinning reserve. It also discusses the Planning Reserve Margin (PRM) and the NPCC reliability criteria approved by the NSUARB, emphasizing the need to ensure resource adequacy and maintain reliability in the bulk power system.