1 Request IR-17: 2 3 In Section 6.2, Planning Reserve Criteria, NS Power quoted a portion of the NPCC reliability 4 criteria regarding probabilistic evaluation of resource adequacy and various factors that 5 need to be considered in that e...
AI summary NS Power states it has sufficient capacity to meet winter peak demand in 2024/2025, including 239 MW of reserve capacity, and expresses confidence in meeting demand during normal conditions. It also mentions that planning reserve margins are designed to handle abnormal situations such as unplanned outages or lower renewable generation.
2024 10-Year System Outlook Report (NSUARB M11764) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 at peak in a single contingency scenario reflecting an unplanned outage to a 150 MW 2 generating unit. 3 4 (b) NS Power ant...
AI summary NS Power anticipates potential interruptions to interruptible customers during periods of high demand and low renewable generation, but not to firm customers. The company will manage its thermal fleet using asset management methodologies to ensure reliability, particularly during winter months, and may increase investment in certain units like Lingan Unit 2 if needed.