HomePlanned OutageM12372Evidence
Topic/Matter Intersection

Topic:"Planned Outage" in M12372

Matter: Nova Scotia Power Inc. - CI C0067906 – POA Boiler Refurbishment 2025 – $1,218,254
3 passages 1 document

Planned Outage across all matters →

N-2NSPI (NSEB) RIR 1 to 5 3 passages
Preamble p. p. 12
- Boiler Tube Failure Reports generated for any failure events that result in unit outages. - Annual Boiler Inspection Reports conducted by NS Power's maintenance contractor under Boiler Asset Strategy Committee supervision. - Header Inspe...

AI summary The document outlines the process for generating and compiling boiler failure and inspection reports, which are used to develop boiler risk profiles. No remedial work is planned for the current year's boiler refurbishment, with major replacements deferred to future projects or treated as operational expenses.

p. p. 13
1 Key assumptions underpinning the estimate include labor and access costs aligned with the 2 planned outage schedule, component replacement requirements identified during 3 inspections, material pricing validated through vendor quotations...

AI summary The text discusses the assumptions behind cost estimates for a planned outage, including labor, access, and material costs. It also includes a request and response regarding the most recent refurbishment of boiler components at Point Aconi, focusing on the scope of work, financial details, and expected service life of the components.

Section 21 p. p. 13
(b) NS Power conducts a planned maintenance outage at the Point Aconi Generating Station each year. This outage includes inspecting critical boiler components, particularly pressure parts and tube shielding, to ensure that tubing has not d...

AI summary NS Power performs annual planned maintenance outages at the Point Aconi Generating Station to inspect and replace boiler components, ensuring safe operation and compliance with regulatory standards. As the unit approaches retirement in 2029/2030, adjusted tube wall thickness criteria are used to optimize investment while maintaining safety.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →