1 Recommendation number 1 is closed. 1 & Labrador. NS Power continues to work with NLH to finalize the associated protocols. 3 NSPML remains engaged with the Independent Engineer (IE) related to the Operations 4 phase of the Maritime Link,...
AI summary The document discusses the status of NS Power's engagement with NLH on protocols, the Independent Engineer's site visits, the status of the Nalcor Project and Muskrat Falls, and the Labrador Island Link. The 900 MW test has been postponed to 2026 due to reservoir levels and winter readiness priorities.