HomePlanned OutageM12744Evidence
Topic/Matter Intersection

Topic:"Planned Outage" in M12744

Matter: Nova Scotia Power Inc. - CI C0080102 – 92H-331 Double Circuit Peggy’s Cove Rd - $4,303,210
2 passages 2 documents

Planned Outage across all matters →

N-1Work Order - Redacted 1 passage
Document No: XXX-XX-XXXX-XXXX p. p. 5
Document No: XXX-XX-XXXX-XXXX Estimate Classification Class 4 Class 3 Class 2 Started or Preliminary Class 5 0% to 2% 1% to 15% 10% to 40% 30% to 75% 65% to 100% Maturity Level of Project Definition Deliverables Defined or Complete General...

AI summary The document outlines project classification and maturity levels for various deliverables, including project location, requirements, technology selection, planning, studies, and technical deliverables. It includes details on defined and preliminary stages of development for different components of the project.

N-2NSPI (NSEB) RIR-1 to RIR-15 1 passage
1 Request IR-1:
NON-CONFIDENTIAL 1 Request IR-1: 17 prevent the restored load from inadvertently operating feeder protection. This is one of the issues 18 the 325 A feeder design limit is intended to mitigate. 1 Request IR-4: 2 3 Please explain why the wo...

AI summary The text discusses the need to complete work under live load conditions for a project involving upgrading distribution feeder 92H-331 by double-circuiting the existing pole line. The upgrade involves replacing poles with taller structures within the current alignment to minimize service interruptions and easement requirements.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →