Home›Planned Outage›M13052›Evidence
Topic/Matter Intersection

Topic:"Planned Outage" in M13052

Matter: Nova Scotia Power - Emergency Services Restoration Plan - 2026 Drill Report
3 passages 2 documents

Planned Outage across all matters →

N-12026 Drill Report 2 passages
1 2.0 2026 ESRP ACTIVATION OVERVIEW p. pp. 3-4
1 2.0 2026 ESRP ACTIVATION OVERVIEW 2 8 10 11 13 3 As per Section 3.0 of the ESRP, each weather event that impacts the province is monitored in - 4 advance by the Early Monitoring Team (EMT) which determines the level of response NS Power...

AI summary The document outlines the activation of the Emergency Services Restoration Plan (ESRP) in 2026, noting that NS Power has activated its Emergency Operations Centre (EOC) five times since the 2025 Drill Report, as monitored by the Early Monitoring Team (EMT).

EOC Pre-Event Planning Sub-Process 5 p. p. 72
EOC Pre-Event Planning Sub-Process 5 This procedure describes the activities associated with the planning conducted prior to a Level 3 or 4 outage event occurring. This process is not intended to cover the full restoration activities under...

AI summary This procedure outlines the planning activities conducted before a Level 3 or 4 outage event occurs. It does not cover restoration activities during an ongoing event.

103694Board letter re: report accepted as filed 1 passage
Section 1
September 24, 2026 [[email protected]](mailto:[email protected]) Jennifer Ross Director, Regulatory Planning and Compliance Nova Scotia Power Inc. PO Box 910 Halifax, NS B3J 2W5 Dear Ms. Ross: M13052 - Nova Scotia Power Inc....

AI summary Nova Scotia Power Inc. submitted its 2026 Emergency Services Restoration Plan (ESRP) Drill Report, which included eleven proposed revisions to the ESRP. The report details the activation of the Emergency Operations Centre (EOC) five times in 2025 due to various events, including six related to snow conditions. The drill simulated a spring wildfire scenario, prompting NS Power to update its wildfire mitigation plan with additional best practices.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →