Home›Planned Outage›M13116›Evidence
Topic/Matter Intersection

Topic:"Planned Outage" in M13116

Matter: Northeast Power Coordinating Council (NPCC) - Third Quarter 2026 for Approval of Revised Regional Reliability Criteria
2 passages 1 document

Planned Outage across all matters →

N-1Application 2 passages
2.0 Minimizing the Impact of Events p. p. 16
2.0 Minimizing the Impact of Events - 2.1 It is recognized that provisions are made in the design of a power system for the satisfactory performance of the system during certain faults or incidents of equipment failure. It is also recogniz...

AI summary This section outlines the importance of designing power systems to handle faults and equipment failures, ensuring sufficient generation and transmission capacity to meet operating reserve, frequency control, and voltage requirements. It also addresses the need to declare emergencies when operating conditions deviate from planned boundaries and follow specific guidelines during such events.

2.0 Minimizing the Impact of Events p. pp. 40-41
2.0 Minimizing the Impact of Events - 2.1 It is recognized that provisions are made in the design of a power system for the satisfactory performance of the system during certain faults or incidents of equipment failure. It is also recogniz...

AI summary This section outlines the importance of planning for system faults and contingencies, ensuring adequate operating reserves, automatic generation control, and voltage stability within normal limits. It also describes abnormal voltage conditions and the procedures to follow when they occur, emphasizing adherence to NPCC and emergency criteria.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →