Topic/Matter Intersection

Topic:"Planning Reserve Margin" in M04265

Matter: P-871 - Nova Scotia Power Inc. - Application for a Load Retention Rate (2000)
6 passages 3 documents

Planning Reserve Margin across all matters →

P-2NSPI (UARB) IR-1 to IR-33; NSPI (Irving Oil) IR-1 to IR-7; NSPI (CBRM) IR-1 to IR-17 - Responses 3 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSUARB FROM: NSPI Question IR-4: The justification of the Tuft's Cove conversion to dual-fuel capability was partly based on the displacement of new generation dictated by environmental considerations. i...

AI summary NSPI confirms that the planning model for the Tuft's Cove conversion considers the latest emissions caps and schedules new plant additions based on either reliability or emissions criteria, whichever is encountered first.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSUARB FROM: NSPI Question IR-7: Please provide a table showing latest capacity available to the NSPI system after station service, the forecast of NSPI system load requirements, reserve capacity and per...

AI summary NSPI responded to an information request from NSUARB by providing a table showing the latest capacity available to the NSPI system after station service, along with load requirements, reserve capacity, and percent reserve for the period 1999–2019. The response references another table, UARB-IR-21, and cites the Public Utilities Act.

General Capabilities
General Capabilities - Data input is structured in a similar manner to PROSCREEN II GAF data. The PROVIEW data base is compatible with PROMOD ill data base translator results. - PROVIEW provides quick turn-around time by eliminating option...

AI summary The document discusses the capabilities of PROVIEW, a planning tool used for evaluating expansion options and demand-side management (DSM) programs. It highlights features such as quick turn-around time, least-cost expansion plan determination, and various objective functions and constraints for optimization.

P-3NSPI (Sempra) IR-1 to IR-14 2 passages
Preamble
en a utility's actual reserve margin equals 14 its target. To compensate for this flaw, some jurisdictions allow utilities to adjust the 15 results downward whenever a utility has excess capacity. 16 17 The value-of-service (VOS) method ca...

AI summary The document discusses the value-of-service (VOS) method for calculating marginal generation capacity costs by measuring the cost of outages or the amount consumers would pay to avoid power loss. It highlights that the VOS method assumes a utility cannot add generating units to meet load increases and that outage costs are influenced by reliability levels and customer expectations.

Hanford Engineering Development Laboratory
Hanford Engineering Development Laboratory Involved in all aspects of modeling and forecasting electricity supply, demand, and power systems costs. Developed and applied load forecasting, production costing, expansion planning, and financi...

AI summary The Hanford Engineering Development Laboratory is involved in modeling and forecasting electricity supply, demand, and power systems costs. It develops and applies various models, including load forecasting, production costing, expansion planning, and financial analysis, and performs cost-benefit analyses of advanced nuclear systems.

07373Board Decision 1 passage
ATTACHMENT "A"
ATTACHMENT "A" This attachment outlines procedures by which the requirements of Availability Clause (1) and Special Condition (1) are to be satisfied. - (1) The customer shall apply in writing to take service under this rate, outlining the...

AI summary This attachment outlines procedures for customers to apply for service under a load retention rate, including initial screening, determination of load retention price, and adjudication by the UARB if needed. It also details economic and technical feasibility criteria and the impact on NSPI's other customers.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →