N-1Report 1 passage
Section 100
interconnections with neighboring Planning Coordinator Areas, transmission 23 transfer capabilities, and capacity and/or load relief from available operating 24 procedures. 42 25 26 The PRM is a long-term planning assumption that is typica...

AI summary The document discusses the Planning Reserve Margin (PRM) as a long-term planning assumption, updated as part of the Integrated Resource Plan (IRP) process. Nova Scotia Power confirmed a 20 percent PRM target as appropriate for long-term planning in its 2020 IRP. The text also references interconnections with neighboring areas and transmission transfer capabilities.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →