Topic:"Planning Reserve Margin" in M11764

Matter: Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024
2 passages 1 document

Planning Reserve Margin across all matters →

N-2NSPI (CA) RIR-1 to RIR-6 - Redacted 2 passages
Section 12
rm capacity over the forecast firm peak; this PRM 20 provides a margin against uncertainties in load growth and resource availability (including 21 demand side resources). 2 10 Year System Outlook Report (M11764), June 27, 2024, page 8 of...

AI summary The document discusses the Planning Reserve Margin (PRM) as a buffer against uncertainties in load growth and resource availability, including demand side resources. It references the 2024 10-Year System Outlook Report (M11764) as a source for this analysis.

Section 18
2024 10-Year System Outlook Report (NSUARB M11764) NSPI Responses to CA Information Requests NON-CONFIDENTIAL 1 Request IR-5: 2 3 Re: Exh. N-1, p. 45. 4 5 Please state when NS Power intends to revisit its planning reserve margin. 6 7 Respo...

AI summary NSPI responds to a request about revisiting the planning reserve margin (PRM), stating no significant changes from IRP assumptions require a PRM study. The 2019 PRM study reaffirmed a 20% target, and a 2023 peak load event validated maintaining this level. Monitoring for reliability changes triggers ELCC calculations or PRM studies if needed.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →