Topic/Matter Intersection

Topic:"Planning Reserve Margin" in M13008

Matter: Nova Scotia Power Inc. - RtR Market Elements Application - Approval of necessary tariffs, Terms and Conditions
1 passage 1 document

Planning Reserve Margin across all matters →

N-5NSPI (Synapse) RIR 1 to 20 1 passage
Capacity Contribution Factor p. p. 17
Capacity Contribution Factor Generator Capacity Capacity (GCi) Contribution Factor TOTAL Capacity (MW) [ELCC] Contribution (CCi) (%) Wind Farm 100 X 10% X = 10.00 BTM Net Billing Spill 3 X 0% X = 0.00 BTM Net Billing Spill 3 X 0% X = 0.00...

AI summary The document discusses the Capacity Contribution Factor, including the contribution of various generators and the Planning Reserve Margin. It includes calculations for Wind Farm, BTM Net Billing Spill, and DistrConn. Solar Generator, with a total capacity of 10.40 MW and a Planning Reserve Margin of 20%.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →