Matter: Nova Scotia Power Inc. - 2027 Annually Adjusted Rates (AARs)
3 passages 1 document

Planning Reserve Margin across all matters →

N-1Application - Redacted 3 passages
Preamble p. p. 37
Billing demand is determined based upon the following formula: Billing demand = (PR/(1+PR) \ min(CD, CCF \ GC)) + (CD - min(CD, CCF\ GC)) Where: PR is Planning Reserve (based on NPCC planning criteria, i.e. 20% or as updated) GC is the thi...

AI summary The text defines the mathematical formula used to determine billing demand for electricity. The formula incorporates the Planning Reserve (PR), which is based on NPCC planning criteria (typically 20%), and the third-party supplier's generating capacity (GC). It specifically addresses non-dispatchable generation by defining GC as the Maximum Spill Capacity (MSC) as specified in the Wholesale Market Non-Dispatchable Supplier Spill Tariff.

DETERMINATION OF MONTHLY STANDBY CONTRACT DEMAND p. p. 37
DETERMINATION OF MONTHLY STANDBY CONTRACT DEMAND Monthly Standby Contract Demand (MSCD) in kW is determined using the following formula: MSCD = LWPFD - min (LWPFD, (\sum_{i=1}^{nn} CCi \ GCi)/(1+PR))

AI summary The document defines the formula for calculating Monthly Standby Contract Demand (MSCD) in kilowatts (kW). The calculation determines MSCD by taking the Load Weighted Planning Factor Demand (LWPFD) and subtracting the lesser of the LWPFD or the total Generating Capacity (GCi) adjusted by the Customer Capacity Factor (CCi) and the Planning Reserve (PR).

- o "CMDAFi" is the Class Monthly Demand Adjustment Factor applicable to each class as set out below: p. p. 37
- o "CMDAFi" is the Class Monthly Demand Adjustment Factor applicable to each class as set out below: Classes Jan, Feb, Dec Mar, Apr May, Jun Jul, Aug, Sep Oct, Nov Domestic 1.00 1.34 2.153 2.296 1.645 Small General 1.00 1. 24 -23 1.632 1....

AI summary The document defines the Class Monthly Demand Adjustment Factor (CMDAFi) for various customer classes, providing a monthly breakdown of factors from January through December. It also defines the Planning Reserve (PR) as a percentage based on the Northeast Power Coordinating Council planning criteria, noting a standard of 20% or as otherwise updated.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →