Billing demand is determined based upon the following formula: Billing demand = (PR/(1+PR) \ min(CD, CCF \ GC)) + (CD - min(CD, CCF\ GC)) Where: PR is Planning Reserve (based on NPCC planning criteria, i.e. 20% or as updated) GC is the thi...
AI summary The text defines the mathematical formula used to determine billing demand for electricity. The formula incorporates the Planning Reserve (PR), which is based on NPCC planning criteria (typically 20%), and the third-party supplier's generating capacity (GC). It specifically addresses non-dispatchable generation by defining GC as the Maximum Spill Capacity (MSC) as specified in the Wholesale Market Non-Dispatchable Supplier Spill Tariff.