Matter: CI# 28098 - P-128.07 - NSPI WO -  Authority to Overspend the Tufts Cove 6 Waste Heat Recovery Project - $8,699,864Approximate value for approval of $8.5 million.
2 passages 1 document

Power Infrastructure across all matters →

N-3Redacted NSPI (NSUARB) IR-1 to IR-20 7/16/2010 2 passages
2.2 BURIED PIPING p. pp. 160-161
2.2 BURIED PIPING - Storm Pipe PVC CAN/CSA- B182.2-M95 SDR 35 and Reinforced Circular Concrete Pipe to CAN/CSA-A257, ASTM C76 designed for flexible rubber joints to ASTM C443, CAN/CSA-A257 - Water Pipe AWWA C110 Ductile Iron and Fittings t...

AI summary The text outlines specifications for various types of buried piping systems, including storm, water, intake, and outfall pipes, along with materials and standards they must comply with. It includes references to specific standards and organizations involved in the project.

Refer to Section 1020 clause 1.8.2 p. p. 259
Refer to Section 1020 clause 1.8.2 Item Con duct or S ize & Typ e Sup ply P rice Inst all P rice Tota l Pri ce Sup ply P rice Inst all P rice Tota l Pri ce Sup ply P rice Inst all P rice Tota l Pri ce Sup ply P rice Inst all P rice Tota l...

AI summary The text presents a table with data on conductor sizes, types, supply and installation prices for various items, including details such as conductor size, type, and total prices. The data appears to be related to electrical components and materials, possibly for infrastructure or utility projects.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →