Topic/Matter Intersection

Topic:"Power Infrastructure" in M03415

Matter: NSPI CI# 38819 - $7,452,511 - 51V Tremont Circuit Breaker & Bus
3 passages 2 documents

Power Infrastructure across all matters →

N-1Redacted Work Order 2 passages
Consulting – Design $386,500 p. p. 7
Consulting – Design $386,500 This estimate includes costs for protection and control design, substation design, and witnessing of tests.

AI summary The document outlines a consulting design cost of $386,500, which covers protection and control design, substation design, and test witnessing.

Preamble p. p. 7
6 7 8 Transmission line construction labour for CI# 33525 is being sourced through NSPI's existing Power Line Technician (PLT) Service Agreement with Emera Utility Services (EUS). This is aligned with NSPI's workforce planning model, which...

AI summary The text discusses the sourcing of transmission line construction labour for CI# 33525 through NSPI's existing Power Line Technician Service Agreement with Emera Utility Services, aligned with NSPI's workforce planning model. It also references attachments and tables related to the ACE 2010 version totals of capital items.

N-2NSPI Redacted Responses to Information Requests 1 passage
NON-CONFIDENTIAL p. p. 0
NON-CONFIDENTIAL 1 Request IR-2: 13 percentage overload is the contingency situation at 120 percent of the 65 degree Celsius 14 manufacturer nameplate MVA. 1 Request IR-5: 2 3 Reference Response to ACE Plan IR-T2, Attachment 1, page 4 of 3...

AI summary The text outlines requests and responses related to infrastructure changes, including the establishment of a 138 KV ring bus and reconfiguration of a 69 KV bus. NSPI explains that there is no incremental cost for establishing the ring bus as it requires the same number of components as an alternative configuration.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →