N-1-aAppendix J - Proposed Regulation Changes 1 passage
7.2.6 Review of Plans and Specifications
7.2.6 Review of Plans and Specifications The Inspection Authority may, prior to issuing a permit, request the submission of plans and specifications for any proposed electrical installation. Plans shall be submitted for all commercial, ind...

AI summary The document outlines the Inspection Authority's power to require the submission of plans and specifications for electrical installations before issuing a permit. It specifies that such plans are mandatory for all commercial, industrial, and institutional installations that exceed 250 volts or 250 amperes.

N-1-aAppendix G - Cost of Service Study - REDACTED (Large File - 14 MB) 1 passage
FOR THE YEAR ENDING DECEMBER 31 , 2007 (IN THOUSANDS OF DOLLARS)
FOR THE YEAR ENDING DECEMBER 31 , 2007 (IN THOUSANDS OF DOLLARS) (1) TOTAL PLANT (2) PRIMARY DEMAND (3) PRIMARY CUSTOMER (4) SECONDARY DEMAND (5) SECONDARY CUSTOMER ( 1) TOTAL NET POLE COST $134,571 ( 2) PRIMARY ONLY (30%) 40,371 $40,371 $...

AI summary The document presents a financial table detailing the 'Total Net Pole Cost' for the year ending December 31, 2007, totaling $134,571,000. It provides a breakdown of these costs across different categories, including Primary Demand, Primary Customer, Secondary Demand, and Secondary Customer. The data distinguishes between 'Primary Only' costs and '50% Joint' costs for both primary and secondary segments, illustrating the allocation of pole-related expenses.

N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB) 2 passages
SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - ( 1) The Company reserves the right to have a separate service agreement if in the opinion of the Company, issues not specifically set out herein must be addressed for the ongoing benefit of the Company and its custom...

AI summary The text outlines special conditions for electricity supply agreements, emphasizing the Company's right to establish separate agreements for specific customer needs. It mandates that customers ensure their load does not compromise power supply system integrity, covering factors such as reliability, harmonics, voltage flicker, and stability. Additionally, it specifies adjustments to meter readings based on the voltage level of the supply point to account for transformer losses.

SPECIAL CONDITIONS
SPECIAL CONDITIONS - 1. The Company reserves the right to have a separate service agreement if in the opinion of the Company, issues not specifically set out herein must be addressed for the ongoing benefit of the Company and its customers...

AI summary The document outlines special conditions for customers using the rate, emphasizing the preservation of power supply system integrity. It mandates that customers ensure their load does not cause issues such as voltage flicker, unbalance, or stability problems, with specific requirements to be defined in separate operating agreements. Additionally, it grants customers the option to enter into separate agreements with NSPI for special fuel purchase arrangements to influence variable energy costs within the rate formula, subject to UARB approval.

N-1-aAppendix E - Dr. Roger A. Morin Exhibits 1 passage
Electricity Transmission & Distribution
Electricity Transmission & Distribution Alta link 46.4% Fortis Alberta 43.2% Enersource Corp 42.8% ENMAX Corp Hydro One 45.9% Hydro Ottawa 50.1% Newfoundland Power 45.3% Toronto Hydro 40.5% Veridian Corp 50.2% Average 45.6%

AI summary The text provides a comparative analysis of 'Alta link' percentages across several Canadian and regional utilities, including Fortis Alberta, Enersource Corp, Hydro One, Hydro Ottawa, Newfoundland Power, Toronto Hydro, and Veridian Corp. The data indicates that these entities range from 40.5% to 50.2%, with an overall average of 45.6%. The document serves as a benchmarking reference for transmission and distribution metrics.

N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB) 2 passages
Hurricane Juan
Hurricane Juan In Q3, 2003 Nova Scotia was struck by Hurricane Juan, a Category Two hurricane causing extensive damage to Nova Scotia Power's transmission and distribution system. The total cost of the hurricane to the Company was $12.6 mi...

AI summary The text describes the impact of Hurricane Juan, a Category Two hurricane, on Nova Scotia Power's infrastructure during Q3 2003. The storm caused extensive damage to the company's transmission and distribution systems. The total financial impact was $12.6 million, which is broken down into $4.0 million in net after-tax operating costs recorded in Q3 2003 and $8.6 million in capital costs.

Hydro-Quebec Obligation
Hydro-Quebec Obligation The obligation associated with Hydro-Quebec represents the estimated present va lue of Bangor Hydro's estimated future payments for net costs associated with ownership and operation of the Hydro-Quebec intertie betw...

AI summary The text describes the financial obligation associated with Hydro-Quebec, which represents the estimated present value of Bangor Hydro's future payments for the ownership and operation of the Hydro-Quebec intertie. This obligation is recognized as a long-term deferred credit permitted for recovery by the MPUC. The regulatory asset is being reduced as expenses are incurred, with the amortization of the asset being reflected in purchase power expenses. It also notes the impact of this obligation on 2004 and 2005 earnings.

N-2-bRIRs 1 to 26 - AEC to NSPI - REDACTED (Large File - MB) 1 passage
How does power get restored?
How does power get restored? Our goal is to restore service to the largest number of affected customers first. First, we check the overall system, repairing damage to power plants, high voltage transmission lines and substations so we have...

AI summary Nova Scotia Power Inc. outlines its prioritized strategy for restoring electrical service following a power outage. The process begins with system-wide repairs to power plants, high-voltage transmission lines, and substations to establish a power supply. Priority is then given to critical services (hospitals, fire, police), followed by high-density housing and large neighborhoods to maximize the number of customers restored quickly. Finally, repairs are directed toward small groups and individual customers.

N-2-gRIRs 1 to 25 - Stutz to NSPI - REDACTED (Large File - 18 MB) 2 passages
21 4.3 Schedule 3 - Determination of Average Installation Labour Costs associated with Street Lighting Gross Assets
21 4.3 Schedule 3 - Determination of Average Installation Labour Costs associated with Street Lighting Gross Assets 23 24 25 26 27 28 29 30 22 This schedule uses the Gross Street Lighting Assets as of December 31 , 2005 of $44.602M and the...

AI summary This schedule details the methodology for determining average installation labour costs associated with street lighting gross assets as of December 31, 2005. By subtracting the total material capital costs (calculated from current material costs and fixture counts) from the total gross plant value of $44.602M, the applicant derived a total installation cost. This result was then divided by the number of fixtures to establish an average installation labour cost of $181.48 per fixture. Due to missing data for incandescent and fluorescent lighting, a 125% escalation factor was applied to 1977 unit costs.

STREET I CROSSWALK LIGHTING STUDY AREA LIGHTING MATERIAL COST ANALYSIS September 2005
STREET I CROSSWALK LIGHTING STUDY AREA LIGHTING MATERIAL COST ANALYSIS September 2005 ITEM DESCRIPTION AVG COST Location 0057155725 BRACKET TAPERED 2"X10' 106.44 0057156020 BRACKET LOWER 2" X 6' 57.25 0057156080 BRACKET FIXED 2" X 8' 87.48...

AI summary This document provides a detailed cost analysis of materials for street and crosswalk lighting as of September 2005. It lists various components, including brackets, plates, and luminaires (specifically Low Pressure Sodium and High Pressure Sodium types), along with their respective average costs and specific location codes. The data serves as a reference for material pricing in infrastructure projects.

N-7-aRIRs 8 to 23 - HRM to NSPI - REDACTED 1 passage
DETERMINATION OF STREET AND CROSSWALK LIGHTING CONNECTED LOAD BY UNIT BASED ON DECEMBER 2005 INVENTORY LEVELS
DETERMINATION OF STREET AND CROSSWALK LIGHTING CONNECTED LOAD BY UNIT BASED ON DECEMBER 2005 INVENTORY LEVELS Description Rate ~ kW.h/Mo. Unit Connected Load lkWl Total Load lkWl Low Pressure Sodium : Low Pressure Sodium 90 Watts Low Press...

AI summary The document presents a detailed inventory and technical calculation of connected loads for street and crosswalk lighting units in Nova Scotia. Based on December 2005 inventory levels, it categorizes various lighting types—including Low Pressure Sodium, High Pressure Sodium, and Metallic Arc lamps—by their specific wattage, monthly kilowatt-hour (kW.h/Mo.) consumption, unit connected load, and total load. The data serves as a technical basis for determining the electrical demand associated with municipal lighting infrastructure.

N-7-bRIRs 142 to 143 - SEB to NSPI - REDACTED (Large File - 45 MB) 1 passage
Powerful Additions
Powerful Additions - 50MW Gas Turbine - $34M Marine Terminal - Powerful Connections - $90M USD Transmission Line

AI summary The document lists specific infrastructure projects categorized under 'Powerful Additions' and 'Powerful Connections.' These include a 50MW Gas Turbine, a $34M Marine Terminal, and a $90M USD Transmission Line. The text serves as a high-level summary of capital assets or projects intended to enhance the utility's generation and transmission capabilities.

N-16Review of NSPI's Fuel Costs on behalf of Avon Valley Greenhouses et al. (AVON) REDACTED (Large File - 38 MB) 1 passage
LIST OF RELEVANT INDEPENDENT POWER PROJECTS (IPP)
ect in Croatia. - For the Treuhandanstalt (privatization agency for east German assets) assistance with the renegotiation of power and steam contracts for a major chemical complex in eastern Germany. - For the Treuhandanstalt (privatizatio...

AI summary The text outlines various projects and analyses conducted by an entity related to independent power production, including contract renegotiations, market analyses, and feasibility studies for power projects in multiple countries such as Germany, Croatia, Colombia, and others.

N-40RIRs Attachment SEB-NSPI - 4a (Large File - 40 MB) 1 passage
Attachment SEB-NSPI-4a
Attachment SEB-NSPI-4a Name of Respondent 62 63 (547) Fuel 64 - 65 (549) Miscellaneous Other Power Generation Exp enses 3 66 (550) Rents + TOTAL Operation (Enter Total of lines 62 thru 66) Maintenance Winter Ministra \ \ \ \ \ \ 69 (551) M...

AI summary The document is a financial table detailing various power production and transmission expenses. It categorizes costs into power production expenses (including fuel, rents, maintenance, and purchased power) and transmission expenses (including load dispatching, station expenses, overhead and underground lines, and rents). The data provides specific line items for operational and maintenance costs, distinguishing between different types of infrastructure and services.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 1 (Large File - 22 MB) 4 passages
CHARACTER OF SERVICE
CHARACTER OF SERVICE Three-phase service directly from the Company's 44 kV or higher transmission system (transmission) or distribution lines (primary). Three phase service at the secondary voltage of transformation facilities supplied fro...

AI summary The text defines the 'Character of Service' regarding three-phase electricity delivery from the Company's infrastructure. It specifies that service can be provided directly from the transmission system (44 kV or higher) or distribution lines (primary), as well as from transformation facilities at secondary voltages. Additionally, it establishes a capacity limitation, stating the Company is not required to serve loads exceeding 20,000 kVa of capacity, unless supplied from transmission facilities of 115 kV or higher.

AVAILABILITY OF SERVICE
AVAILABILITY OF SERVICE (C) Available for general service to customers. Customers shall contract for a definite amount of electrical capacity in kilowatts, which shall be sufficient to meet maximum requirements, but in no case shall the co...

AI summary The document specifies the requirements for customers seeking general electrical service. It mandates that customers must contract for a definite amount of electrical capacity in kilowatts, ensuring the capacity is sufficient to meet their maximum requirements. Additionally, it establishes a minimum contract capacity threshold of 1,000 KW for such services.

TYPE OF SERVICE
TYPE OF SERVICE The Company will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages, where available: Single-phase, 120/240 volts, 120/208 volts, 240/480 volts or other available...

AI summary This section outlines the technical specifications for the electrical service provided by the Company. It specifies that 60 Hertz service is delivered via a single meter at various single-phase and 3-phase voltages depending on availability and customer requirements. It notes that specific high-voltage options may be available if the customer provides suitable space for infrastructure and details requirements for motors exceeding 5 H.P., which must be equipped with starting compensators.

TYPE OF SERVlCE
TYPE OF SERVlCE The Company wj]) furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages, where available: Single-phase, 120/240 volts, 120/208 volts, 240/480 volts or other available...

AI summary The text outlines the types of 60 Hertz electrical services provided by the Company, specifying various single-phase and 3-phase voltage options available at delivery points. It notes that specific high-voltage 3-phase options may be available depending on contract size and the provision of suitable space for infrastructure like substations or transformer vaults. Additionally, it establishes requirements for motor configurations, stipulating that motors exceeding 5 H.P. must have starting compensators.

N-40RIRs Attachment SEB-NSPI - 2h 3 passages
Voltage: Transmission Power Factor: 90% Assumes Substation Ownership
Voltage: Transmission Power Factor: 90% Assumes Substation Ownership ASSUME TIONS Firm Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Interruptible Monthly kW 0 Load Factor 0% Monthly kWh 0 Total Monthly kW 50,000 Load Factor 90%...

AI summary The document provides technical specifications for a Large Power Service rate, assuming substation ownership. It outlines the load profile for a firm service, specifying a monthly capacity of 50,000 kW, a load factor of 90%, and a resulting monthly energy consumption of 32,850,000 kWh. It also notes that interruptible service would result in zero capacity and energy values.

Section 70
hll p'i/v.WJJ sc:cna.com/SCEGIIn•BusinessJCustomer•Service/lv1anage+Energy+UsPjCommercial•and+lnrJustriai+Eieclric+Rates.hlm Voltage: Transmission Power Factor: 90% Assumes Substation Ownership

AI summary The provided text is a header or footer fragment from a Nova Scotia Power document regarding commercial and industrial electricity rates. It specifies technical parameters for transmission power, including a voltage requirement, a transmission power factor of 90%, and a condition that the analysis assumes substation ownership.

Section 73
NW'.N swe pco comJCuslomerSerJice/RatesAndT;~ riff slleg ~I T~rir-fFrlinqs Arkansr~s aspx Rates Effective: LL&P 3/5/2004 Experimental Curtailable Rider 3/5/2004 Voltage: Transmission Power Factor: 90% Assumes Substation Ownership

AI summary The provided text appears to be a fragmented or corrupted technical data snippet regarding utility rate structures. It mentions specific effective dates for rates (March 5, 2004), an Experimental Curtailable Rider, and technical specifications including a transmission power factor of 90% and the assumption of substation ownership.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 2 (Large File - 15 MB) 3 passages
TYPE OF SERVICE
TYPE OF SERVICE Service will be alternating current 60 hertz, three-phase at a transmission voltage of not less than 69,000 volts.

AI summary The document specifies the technical requirements for the type of service to be provided, defining it as alternating current at 60 hertz, three-phase, with a transmission voltage of no less than 69,000 volts.

FACILITIES CHARGE
FACILITIES CHARGE In the event the Company is required to install and operate additional transmission plant, switching stations or transformation to meet the customer's requirements, a Facilities Charge shall be included under this rate. T...

AI summary The text defines the 'Facilities Charge' rate, which applies when the Company is required to install and operate additional transmission infrastructure, switching stations, or transformation facilities to meet specific customer requirements. It explicitly states that the installed costs of metering are included in the determination of this charge.

TYPE OF SERVICE
TYPE OF SERVICE Service will be alternating current 60 hertz, three-phase at a transmission voltage of not less than 69,000 volts.

AI summary The document specifies the technical requirements for the type of service provided, defining it as alternating current at 60 hertz, three-phase, with a transmission voltage of at least 69,000 volts.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 5 (Large File - 20 MB) 1 passage
XI. DEFINITION OF TRANSMISSION, PRIMARY AND SECONDARY VOLTAGE CUSTOMER
XI. DEFINITION OF TRANSMISSION, PRIMARY AND SECONDARY VOLTAGE CUSTOMER - A. A transmission voltage Customer is any Customer whose delivery voltage is 69 kV or above. - B. A primary voltage Customer is any Customer (a) served from a circuit...

AI summary This section provides the formal definitions used to categorize customers based on their delivery voltage and connection characteristics. Customers are classified into three categories: transmission voltage (69 kV or above), primary voltage (customers served from 69 kV circuits with 4,000 volts or more delivery, specific circuits without company-owned transformation, certain legacy connections prior to 1992, or where company-owned transformation became necessary due to circuit voltage changes), and secondary voltage (all other customers).

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 2 passages
Conditions of Service.
Conditions of Service. - 1. The Company reserves the right to curtail service to the customer at any time and for such period of time that in the Company's sole judgement the operation of its system requires curtailment of customer's servi...

AI summary The text outlines the Conditions of Service for interruptible power supply, specifying the Company's rights to curtail service for system operations. It establishes minimum availability requirements for contract capacity (145 hours weekly and 630 hours monthly), except during emergencies. Customers are required to respond to curtailment requests within ten minutes and are responsible for maintaining substations. It also details options for auxiliary switching and billing for non-interruptible service.

PRIMARY DISTRIBUTION AND TRANSMISSION LINES SERVICE
PRIMARY DISTRIBUTION AND TRANSMISSION LINES SERVICE The above demand charge for primary distribution and transmission line service are predicated on the customer's taking service at the applicable available voltage and furnishing, installi...

AI summary The text describes the prerequisites for the demand charge associated with primary distribution and transmission line services. It specifies that customers must take service at applicable voltages and are responsible for furnishing, installing, and maintaining all necessary substation structures and equipment. Additionally, it lists the nominal primary distribution voltages (ranging from 2,400/4 to 34,500) and transmission line voltages (69,000, 138,000, and 345,000) available from the Company.

N-44RIRs 76 to 136 - CA to NSPI - REDACTED (Large File - 19 MB) 1 passage
Industry:
Industry: - Asset Optimization - Capital Management - Nuclear - Gas, Electric and Combined Gas/Electric Utilities - Natural Gas Exploration - Retail Energy - Merchant Energy / Developers

AI summary The text lists various industry sectors and areas of focus, including asset optimization, capital management, nuclear energy, gas and electric utilities, natural gas exploration, retail energy, and merchant energy/developers.

86472Submission - Re: Future Filing Requirements and comments on Board Draft Strawman 1 passage
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart ofNSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizati...

AI summary The document outlines a list of requested information for a regulatory proceeding, including organizational profiles, financial documents, and operational data related to NSPI and EMERA. It includes details on assets, reliability statistics, customer information, and emissions targets.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →