nd pipeline system. Synapse Energy Economics, Inc. NSPI Thermal Generation Utilization and Optimization M08059 22 Final Report 3. MODELING RESULTS 3.1. Capacity Balance, Build and Retirement Results Planning Reserve Requirements – Capacity...
AI summary This section discusses modeling results related to capacity balance, build and retirement of generation resources. It highlights planning reserve margins (PRM) by scenario and year, and details how the Plexos model optimizes retirement and build decisions based on cost minimization.
CC253 Batt 20 Batt 40 Batt 100 2 Med DSM Wind 100 Ret Lin 2 Ret Lin 4 Ret Batt 40 Batt 20 Batt 40 Ret Batt 20 Batt 120 Ret Lin 2 New New CC253 4 Ref/HighSusCap Ret Lin 3 Wind 100 CT100 Ret Batt 100 Batt 100 Batt 20 Batt 20 Batt 20
AI summary The text appears to be a diagram or schematic representing various components and connections related to energy systems, including batteries, wind power, and transmission lines. It includes labels such as 'CC253,' 'Batt 20,' 'Wind 100,' and 'Ret Lin 2,' which may refer to specific infrastructure elements or projects.
Batt 100 Batt 40 100 Ret Batt 40 New 1HG Ref/HighGas Wind 100 Ret Lin 2 New CC253 Ret CC253 Batt 20 Batt 20 Batt 20 Batt 20
AI summary The text appears to be a diagram or schematic related to energy infrastructure, showing components such as batteries, wind generation, and transmission lines, along with references to projects like CC253 and components like CT100 and CT200.
Ref/NB 13HG Trans/AdditionalWind/ Wind 100 Ret Lin 2 Wind 100 Wind 100 Wind 100 Wind 100 Wind 100 Ret Lin 4 HighGas New CC253 Batt 40 Batt 20 Batt 20 Batt 20 Batt 20 et Ref/NB New Ret Pt 13LG Trans/AdditionalWind/ Wind 100 Ret Lin 2 Wind 1...
AI summary The text appears to be a table or diagram showing various components and connections related to wind power and battery systems, including references to 'Ref/NB', 'Ret Lin', 'CC253 Batt', 'CT100', and 'Batt 20'. These terms may refer to specific projects, components, or locations within a power infrastructure context.
Build Costs Annualized fixed costs Per assumptions memo (see Table 5 above). Sustaining Capital Costs Annualized fixed costs Per assumptions memo (see Table 6 above). Plexos Production Cost ‐ Fuel, VO&M, FO&M, Startup, and Net Interchange...
AI summary The text discusses the composition of revenue requirements, highlighting that a majority of costs come from fixed and variable operating costs, fuel costs, and Maritime Link Surplus and New Brunswick net imports purchase costs as modeled in Plexos. Maritime Link costs are estimated to account for 14-16% of the total NPVRR and are based on the Maritime Link Interim Cost Assessment case.