Topic/Matter Intersection

Topic:"Power Infrastructure" in M09096

Matter: Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne (E1) and Nova Scotia Power Inc.(NS Power), the establishment of a final agreement between the parties, and approval of a 2020-2022 Demand Side Management (DSM) Resource Plan
2 passages 2 documents

Power Infrastructure across all matters →

E-3E1 (NSPI) RIRs to IR-1 to IR-69 1 passage
Section 1825
E W/E Air Speed R1 Comfort Plus R C J1 J2 J3 J4 Y1 W LV Circuit Board C D D2 A B

AI summary The text contains a diagram or schematic with labels such as 'R1', 'Comfort Plus', 'J1', 'J2', 'J3', 'J4', 'Y1', 'LV Circuit Board', 'C', 'D', 'D2', 'A', and 'B'. It appears to represent a technical illustration, possibly related to electrical systems or infrastructure.

E-23NSPI (IG) RIR-1 to RIR-10 - Redacted 1 passage
70% p. p. 119
70% PSS/e Load Data 2021SUM Case Distri bution Ge neration (MW) Net MW at Fet Muser 199303 1V-AVON 69.000 2.33 0.32 0.00 2.3 0.32 199307 18V-BURLINGT69.000 4.40 0.87 2 2.00 3.0 0.79 199309 79V-3MIPLAIN69.000 15.64 5.60 6 6.00 11.4 3.34 199...

AI summary The document presents a table of PSS/e Load Data from 2021SUM, detailing bus numbers, names, and associated generation and load data in megawatts (MW) and megavolt-ampere (Mvar). It includes information on various locations, such as Avon, Burlingto, and Newminas, with specific values for MW and Mvar under different categories like wind, biogas, and biomass.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →