N-7NSPI (Synapse) RIR-1 to RIR-46 - Redacted
2 passages
• Target reactive power setpoint versus actual reactive power setpoint measured (%) . REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED 2023 Load Forecast Report Synapse IR-9 Attachment 2 Page 70 of 205 CI C0010788 – Smart Grid Semi-Ann...
AI summary The text includes a redacted section from a 2023 Load Forecast Report and a Smart Grid Semi-Annual Report, focusing on reactive power setpoints and other technical details related to grid management and load forecasting.
• Target PF setpoint versus actual PF measured (%) • Customer Demand (kVA)
AI summary The text presents two metrics: Target PF setpoint versus actual PF measured in percentage, and Customer Demand in kVA. These metrics are likely used for monitoring and evaluating power factor performance and customer demand levels.
Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →