Topic/Matter Intersection

Topic:"Power Infrastructure" in M12343

Matter: NSPI Complaint - Power Connection - Roseview Developments Inc.
2 passages 1 document

Power Infrastructure across all matters →

98234Complainant Submission - Nova Scotia Power Inc. Utility Service Requirements 2023 Edition - Effective May 1, 2023 2 passages
MINIMUM CLEARANCE BETWEEN POWER DUCTS AND FUEL STORAGE TANKS OR PIPE LINES p. p. 56
MINIMUM CLEARANCE BETWEEN POWER DUCTS AND FUEL STORAGE TANKS OR PIPE LINES DATE: 2008-09-15 REV DATE: 2016-04-11 DRAWN: H. V. HUYNH STD NO: 1U-ED-41M . APPROVED: Jistu Tadyan SHEET: 1 of 1 (R1) MINIMUM CLEARANCES BETWEEN POWER DUCTS AND PI...

AI summary This document outlines the minimum clearance requirements between power ducts and fuel storage tanks or pipelines, as specified in standard 1U-ED-41M, revised on April 11, 2016. It was drawn by H. V. Huynh and approved by Jistu Tadyan.

- 2. The item numbers refer to the number shown inside a circle (or ellipse) on the drawings. p. p. 136
- 2. The item numbers refer to the number shown inside a circle (or ellipse) on the drawings. ITEM NO. DESCRIPTION MFG.CAT.NO. C 1066 CONDUIT – COUPLING PVC TO PVC, FOR USE ON 4" (100 MM) DB TYPE II CONDUIT SCEPTER EC55 C l067 CONDUIT – CO...

AI summary The text lists various items with descriptions and manufacturer catalog numbers, primarily related to electrical conduit, connectors, and enclosures used in infrastructure. These items are referenced by item numbers and include details on materials and specifications.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →