N-72026-2027 GRA Appendix 8A-G -Depreciation Study - Redacted
11 passages
T - EV CHARGERS 15 - S3 0 987,094 158,436 828,658 71,330 7.23 11.6 363.20 ENERGY STORAGE EQUIPMENT - DISTRIBUTED SOLAR 25 - S3 0 1,123,202 64,625 1,058,577 48,536 4.32 21.8 363.30 ENERGY STORAGE EQUIPMENT - BATTERIES 10 - S3 0 1,261,438 20...
AI summary The text presents a table with various categories of energy-related equipment and infrastructure, including EV chargers, energy storage equipment, poles, towers, overhead conductors, underground conduit, and underground conductors. It lists quantities, costs, and other metrics for each category.
11,381,467 3,441,318 2,999,923 7,280 82 included above 3,520,000 4,329,600 6,961,318 BLACK RIVER White Rock Main Dam unknown Headpond 39 200 140 unknown 74 274 11.9 61.0 101 1 5,142,345 1,253,909 1,313,265 15,415 55 included above 4,400,00...
AI summary The text contains numerical data related to various infrastructure components, including dam and penstock details, along with financial figures such as costs and revenues. It appears to be a technical and financial summary of infrastructure projects.
106 include above included above include above included above 164,385 included above MERSEY Lower Great Brook Right Wing Dam Concrete Headpond 11 365 131 128 365 3.4 120 1 include above included above include above included above 164,385 i...
AI summary The text contains data related to infrastructure components, including a dam and penstock units at the Lower Great Brook site, with details such as material type, location, and capacity, though much of the data is marked as 'include above' or 'included above'.
60 3 include above included above include above included above 164,385 included above MERSEY Deep Brook Penstock Unit 1 N include above included above include above included above included above MERSEY Deep Brook Penstock Unit 2 N include...
AI summary The text appears to be a table containing information about infrastructure assets, including details about penstock units and dams, with numerical data such as capacity, costs, and other metrics. The data includes entries for MERSEY and Deep Brook Penstock Unit 1 and 2, as well as Cowie Falls Left Wing Dam.
1 3,560,625 3,560,625 4,379,569 included above 2,109,375 included above 5,670,000 TUSKET Great Barren Lake Dam and spillway None (Earthfill) Storage 18.8 1,050 138 134 140 130.2 1,190 5.7 119 1 4,747,500 4,747,500 5,839,425 100,320 include...
AI summary The text presents numerical data related to infrastructure projects, including dam and spillway details, costs, and capacities. The data includes figures for TUSKET projects such as Great Barren Lake Dam, Mink Lake Dam/Spillway, and Penstock Unit 1, with information on storage, cost, and other metrics.
Site number Location Cost July 2024 1 Lingan Thermal Generating Station 48,429,000 2 Point Aconi Thermal Generating Station 27,615,000 3 Point Tupper Thermal Generating Station 30,354,000 4 Trenton Thermal Generating Station 39,207,000 5 T...
AI summary The text provides a list of infrastructure projects in Nova Scotia with their respective locations and costs as of July 2024, including thermal generating stations, gas turbines, and transportation and railway facilities.
ed with Production Plant) $ . 27 Oil/Gas Supply Structures - Remove to Grade Level $ . 300's BOILERS AND AUXILIARIES: 33 Boiler Plant - Removals $ . 34 Boiler Instruments and Control Removals . . $ 35 Fuel Handling Systems Removals $ 36 Bo...
AI summary The document outlines various removal and decommissioning activities related to production plants, boilers, turbines, and electrical systems, including items such as boiler plant removals, fuel handling systems, and environmental systems.
l Cable Systems 575 Power Cable Systems 58 ELECTRICAL CONTROL AND COMMUNICATION 38,789 580 General Electrical Controls 14,547 581 Communications 4,557 582 Supervisory and Telemetering System (SCADA) 2,734 583 Fire detection and Safety Syst...
AI summary The text includes a list of power cable systems and electrical control and communication costs, followed by a redacted section from a document related to the 2026-2027 GRA Direct Evidence Appendix 8D.
na 568 Generator Output System 18,227 57 AUXILIARY SYSTEMS AND EQUIPMENT REMOVALS 91,133 (IF NOT COVERED ELSEWHERE) 570 General 91,133 571 Lighting line 158 572 Grounding (All Buildings, Tanks and Stacks) line 211 573 Cable Tray and Condui...
AI summary The text includes a line item for 'Generator Output System' with a value of 18,227 and a section on 'Auxiliary Systems and Equipment Removals' with a total of 91,133, including subcategories such as lighting, grounding, cable tray, and control and power cable systems. The document is part of an estimate for Tufts Cove Generating Station.
369 Coal Mill lnerting System (Steam and CO2) 37 ASH AND WATER TREATMENT SYSTEMS REMOVALS does not apply to this site 370 General 371 Unit Ash Handling System (may include Magnesium Hydroxide Injection) 372 Station Ash Handling System 373...
AI summary The text outlines various systems and components related to coal mill inerting, ash handling, wastewater treatment, environmental systems, and turbine-generator removals at a site, with specific details on costs and applicable systems.
RAILS AND BRIDGES 60 - S3 0 344,183 110,123 234,060 6,260 1.82 37.4 TOTAL TRANSMISSION PLANT 1,254,616,801 513,076,344 971,188,679 33,825,592 2.70
AI summary The text presents numerical data related to rail and bridge costs and total transmission plant expenses, including figures such as 344,183, 110,123, and 234,060, along with percentages and other metrics.
N-24NSPI (ECC) RIR 1-41
4 passages
ACCOUNT 359.00 ROADS, TRAILS AND BRIDGES AVG AGE RET 13.8 PLACEMENT BAND 1938-2023 001 EXPERIENCE ANALYSIS EXPERIENCE BAND 1957-2023 AGE AT BEGIN OF INTERVAL EXPOSURES AT BEGINNING OF AGE INTERVAL RETIREMENTS DURING AGE INTERVAL RETMT RATI...
AI summary This document presents an experience analysis table for Account 359.00, which covers roads, trails, and bridges. It details exposure data, retirements, survival ratios, and percentages across various age intervals. The table is part of a 2026-2027 General Rate Application (GRA) attachment.
NOVA SCOTIA POWER, INC. ACCOUNT 362.10 SCADA EQUIPMENT SUMMARY OF CURVE FITTING RESULTS - PCT SURV BALANCED AREAS PLACEMENT BAND 1996-2023 001 EXPERIENCE BAND 2009-2023 SURVIVOR RESID RANGE OF SURVIVOR RESID RANGE OF CURVE MEAS FIT CURVE M...
AI summary The document provides a summary of curve fitting results for SCADA equipment under Account 362.10, focusing on survivor residue ranges and curve measurement fit between 1996 and 2023, with a specific segment between 85.0 and 15.0 percent surviving.
Notes: - Five largest buildings - o Lower Water Street HQ - o Lakeside - o Sackville - o Ragged Lake ECC - o Ragged Lake MCC - Are there any locations/offices/service centers that NSPI needs to vacate because it's in a growing area and it'...
AI summary The text outlines NSPI's need for additional space due to growth and remote work impacts, including potential expansions at Lakeside and Sackville. It also mentions infrastructure needs such as mechanical cooling, HVAC upgrades, and road and bridge maintenance. A meeting with Robert Doiron on 6/25/2024 is noted.
KEY FINDINGS Based on the common themes observed, the following are the key guiding principles to inform the Action Plan and Roadmap Items: - Variable renewable capacity additions are required to meet the 2030 targets. Up to 1500MW of addi...
AI summary Key findings emphasize the need for 1500MW of additional wind capacity and 200MW of solar capacity by 2030. Battery storage, firm capacity, and synchronous condensers are critical for system reliability. The Atlantic Loop project is highlighted as beneficial for reducing costs and emissions, requiring government support. NS Power has updated its 2020 IRP Action Plan and Roadmap based on 2023 modeling.
N-27NSPI (NSEB) RIR 1-152 - Redacted (settlement agreement attached at IR-1)
4 passages
Appendix "A" GRA Element Settlement Terms 357.00 358.00 359.00 UNDERGROUND CONDUIT UNDERGROUND CONDUCTORS AND DEVICES ROADS, TRAILS AND BRIDGES 65 - S3 45 - S3 60 - S3 0 (10) 0 1,736,139 7,345,546 344,183 611,263 853,459 110,123 1,124,876...
AI summary The document provides a detailed breakdown of settlement terms for various infrastructure elements including underground conduit, transmission plant, distribution plant, and station equipment, with associated costs, revenues, and percentages. This data is presented in a tabular format for clarity and reference.
1 Figure 8 – Project Accountabilities Matrix 2030 Projects Accountability NS Power Key Action Items NS Government Key Action Items Partner Key Action Items including required connection to competitive authorizations. Salisbury, NB. procure...
AI summary The document outlines project accountabilities for 2030 initiatives, including Fast-Acting Generation, Ocheranon, and Fuel Conversions. NS Power is responsible for procuring and financing projects through a utility-regulated model, while the NS Government is tasked with ensuring coordinated reviews and federal support. NSIESO is involved in procuring fast-acting generation resources and completing interconnection studies.
1 5.0 STORM HARDENING – TARGETED EQUIPMENT REPLACEMENTS AND 2 UPGRADES 3 4 2024-2029 Forecast Investment: $916 million 5 Forecasted Performance Standards SAIDI Reduction: 0.13 to 0.24 hours 6 7 NS Power's Storm Hardening - Targeted Equipme...
AI summary NS Power's Storm Hardening Program aims to improve the reliability and resilience of the power system through targeted equipment replacements and upgrades, with a forecast investment of $916 million from 2024 to 2029. The program focuses on distribution, transmission, and substation upgrades to reduce unplanned outages and adapt to worsening weather conditions.
20 5.3 Substation Upgrades and Replacements 21 22 2025-2029 Forecast Investment: $233 million 23 - 24 This program supports a range of initiatives to replace existing substation assets such as - 25 transformers, breakers and switches. Addi...
AI summary The document outlines a $233 million investment plan for substation upgrades and replacements between 2025 and 2029, including the replacement of transformers in Nictaux, Springhill, Mahone Bay, and Dartmouth, as well as enhancements at the Middlefield substation.
N-92Compliance Filing - Standardized Filings - Redacted
16 passages
(1) FUEL 445,457 434,033 - - - 11,424.2 (2) PURCHASED POWER: (3) OTHER THAN BIOMASS AND WIND 18,478 18,420 - - - 58.1 (4) BIOMASS 20,303 20,238 - - - 64.1 (5) MARITIME LINK 198,664 198,036 628.5 (6) WIND ENRIS 33,418 33,315 - - - 103.1 (7)...
AI summary The text presents a table with fuel and power production costs, including figures for purchased power, biomass, wind, and imports, along with associated costs and credits. It includes specific line items such as 'Maritime Link' and 'Butu Capacity Credit.'
ME POWER LOAD FOLL. ELIADC BUTU SPILL PRICING EBS RTR OATT TOTAL BTL
AI summary The text presents a table with various columns related to power, load, and energy management, including terms such as ELIADC, BUTU, SPILL, PRICING, EBS, RTR, and OATT, which are likely related to energy systems and market operations.
(1) FUEL - - - - - - - - - - (2) PURCHASED POWER: (3) OTHER THAN BIOMASS AND WIND - - - - - - - - - - (4) BIOMASS - - - - - - - - - - (5) MARITIME LINK - - - - - - - - - - (6) WIND ENRIS - - - - - - - - - - (7) WIND NRIS - - - - - - - - -...
AI summary The text presents a table with various categories related to fuel and power production, including purchased power, biomass, wind, and imports. It includes sections such as 'Butu Capacity Credit' and 'Thermal Operating & Maint.' but lacks numerical data or detailed explanations.
0 0 0 0 0 0 (24) STREET LIGHTING 0 0 0 0 0 0 0 0 0 0 0 (25) CUSTOMER SERVICE 0 0 0 0 0 0 0 0 0 0 0 EXHIBIT 6B (26) (27) TOTAL CUSTOMER 58,644 53,013 2,986 1,328 2 249 17 3 0 1 1,045 (28) (29) RETAIL (30) (31) METERS 0 0 0 0 0 0 0 0 0 0 0 N...
AI summary The document contains numerical data related to customer service, street lighting, and infrastructure metrics such as substations, overhead lines, and underground lines, with some entries referencing exhibits and pages.
7 P-9 (34) DISTRIBUTION - Line Transformers 27,737 18,961 1,052 5,464 336 611 682 293 0 80 258 P-9 (35) DISTRIBUTION -Services 0 0 0 0 0 0 0 0 0 0 0 P-9 (36) DISTRIBUTION -Meters 0 0 0 0 0 0 0 0 0 0 0 P-9 (37) DISTRIBUTION PLANT - Streetli...
AI summary The text presents a table with various distribution-related line items and their associated costs, including line transformers, meters, and streetlight distribution plant, with some entries redacted and labeled as confidential. The table includes figures across multiple years and categories, such as 2026-2027 GRA Compliance Filing.
(1) PRODUCTION PLANT (2) (3) STEAM $806,726 $806,726.0 $0 $0 $0 $0 (4) HYDRO 752,403 $752,402.7 0 0 0 0 (5) WIND 153,864 $153,864.4 0 0 0 0 (6) SOLAR 1,224 $0.0 $0.0 $0.0 $0.0 1,224 (7) LM6000 96,372 $96,371.8 0 0 0 0 (8) GAS TURBINE - OTH...
AI summary The text presents a financial breakdown of various production plants and transmission systems, including steam, hydro, wind, solar, and gas turbine facilities, with detailed figures for costs and allocations. It also includes a total for the production plant and transmission plant costs.
(1) FUEL - 0.0% 0.0% 0.0% 0.0% (2) PURCHASED POWER: (3) OTHER THAN BIOMASS AND WIND - 0.0% 0.0% 0.0% 0.0% (4) BIOMASS 0.0% 0.0% 0.0% 0.0% (5) MARITIME LINK 0.0% 0.0% 0.0% 0.0% (6) WIND ENRIS - 0.0% 0.0% 0.0% 0.0% (7) WIND NRIS 0.0% 0.0% 0....
AI summary The text presents a table with various fuel and power production categories, showing percentages and figures related to costs and operations. Most categories show 0.0% values, while some, like thermal operating and maintenance, have specific figures and percentages.
(1) FUEL - - - - - - - - - - (2) PURCHASED POWER: (3) OTHER THAN BIOMASS AND WIND - - - - - - - - - - (4) BIOMASS - - - - - - - - - - (5) MARITIME LINK - - - - - - - - - - (6) WIND ENRIS - - - - - - - - - - (7) WIND NRIS - - - - - - - - -...
AI summary The document text presents a table with various categories related to fuel and power production, including purchased power, biomass, wind, and imports, along with associated costs and maintenance expenses. It includes data for thermal and hydro operating and maintenance costs, with specific values listed for thermal operating and maintenance at 27 and 2,239.
- (44) SUBSTATIONS - 50 (45) OVERHEAD LINES BEFORE STORM EXPENSES - 1,092 (46) OVERHEAD LINES STORM EXPENSES - 728 (47) UNDERGROUND LINES - 19 (48) LINE TRANSFORMERS - - (49) METERS (Meter Shop Only) - - (50) COMMUNICATIONS - - (51) STREET...
AI summary The text lists various line items related to distribution and customer operations, including substation costs, overhead and underground line expenses, and total distribution costs. It also mentions generation services, indicating a focus on infrastructure and operational expenditures.
TIME REAL TIME POWER LOAD FOLL. ELIADC BUTU SPILL PRICING PRICING PRICING OATT TOTAL BTL
AI summary The text presents a real-time power load and pricing data table, including metrics such as ELIADC, BUTU, SPILL, and OATT, with columns related to pricing and total BTL.
(1) DEMAND (2) (3) SUBSTATIONS $2,176 $1,461 $79 $405 $52 $46 $53 $48 $0 $12 $19 P-5 (4) OVERHEAD LINES Before Storm Expense 16,279 11,151 610 3,077 278 350 374 224 0 66 149 P-1 (5) OVERHEAD LINES Storm Expense 6,148 4,211 231 1,162 105 13...
AI summary The text presents a table with various line items related to demand, including substation costs, overhead lines before and after storm expenses, underground lines, line transformers, meters, communications, street lighting, and customer service, with associated costs and project identifiers.
0 0 0 0 0 0 (24) STREET LIGHTING 0 0 0 0 0 0 0 0 0 0 0 (25) CUSTOMER SERVICE 0 0 0 0 0 0 0 0 0 0 0 EXHIBIT 6B (26) (27) TOTAL CUSTOMER 58,345 52,707 2,996 1,324 2 253 17 3 0 1 1,042 (28) (29) RETAIL (30) (31) METERS 0 0 0 0 0 0 0 0 0 0 0 N...
AI summary The text presents a table with various categories and numerical data, including street lighting, customer service, meters, substation counts, overhead and underground lines, and associated exhibits and references. It appears to be part of a regulatory proceeding related to utility operations and infrastructure.
0 0 0 0 0 0 0 0 P-9 (36) DISTRIBUTION -Meters 0 0 0 0 0 0 0 0 0 0 0 P-9 (37) DISTRIBUTION PLANT - Streetlight 4,757 0 0 0 0 0 0 0 0 0 4,757 Direct (38) GENERAL PROPERTY 16,886 11,728 644 3,210 196 366 369 170 0 47 157 P-9 (39) (40) TOTAL D...
AI summary The text presents a table with various distribution and demand-related line items, including meters, streetlights, and general property, along with associated costs and classifications such as 'Direct' and 'P-9'. The table includes totals for the distribution function and demand, with figures spanning multiple years.
URCES (206) HUMAN RESOURCES 9,248.4 -2,000 (207) (208) POWER PRODUCTION (209) POWER PRODUCTION - FUEL 366,094.3 (210) POWER PRODUCTION - OPERATING & MAINT. 58,188.7 (211) POWER PRODUCTION - HYDRO PLTS. 2,394.5 (212) POWER PRODUCTION - WIND...
AI summary The document provides a detailed breakdown of various costs and expenses related to human resources and power production, including fuel, operating and maintenance, hydro, wind, solar, biomass, and purchased power. It includes figures for different categories and subcategories of expenses.
ion BP Substation - LIR 8,309.6 (133) Distribution BP Substation - Municipal (134) Distribution Primary Voltage - LIR 50,427.4 (135) Distribution Primary Voltage - Municipal 14,918.0 (136) (137) System Coincident DMD (138) EHV - LIR 18,609...
AI summary The text presents a list of items related to electrical infrastructure, including substation and voltage categories, with associated costs for different entities such as LIR (Local Independent Retailer) and Municipal. These items are likely part of a cost or asset listing in a regulatory proceeding.
$2,293,010 $1,839,309 $1,978,438 $338,372 $1,772,457 $1,809,283 $2,305,286 $2,403,282 $1,901,195 $345,941 $1,992,106 $2,047,198 $21,025,878 Maritime Link ML - NS Block (GWh) $13,608,333 $13,608,333 $13,608,333 $13,608,333 $33,033,866 $13,6...
AI summary The document presents financial data and figures related to energy projects, including the Maritime Link (ML) and other energy generation sources such as IPP and Comfit. The data includes monetary values and energy output measurements over various periods.