DESCRIPTION: This project includes the installation of a 600-meter underground ductbank system along Robie St in Halifax, as well as the installation of a second underground 3 phase 25kV supply in the same duct work. As part of the QEII Ha...
AI summary This project involves installing a 600-meter underground ductbank system and a second 3 phase 25kV supply along Robie St in Halifax to support anticipated load growth. The work is being done concurrently with the QEII Halifax Infirmary Expansion Project to reduce costs and disruption. NS Power has a cost-sharing agreement with the QEII project for this work, expected to save approximately $2 million.