Matter: Nova Scotia Power inc. - CI C0074130 – Robie Street Underground – $4,465,119 (P&A)
3 passages 2 documents

Power Infrastructure across all matters →

N-1Application - Redacted 2 passages
DESCRIPTION: p. p. 7
DESCRIPTION: This project includes the installation of a 600-meter underground ductbank system along Robie St in Halifax, as well as the installation of a second underground 3 phase 25kV supply in the same duct work. As part of the QEII Ha...

AI summary This project involves installing a 600-meter underground ductbank system and a second 3 phase 25kV supply along Robie St in Halifax to support anticipated load growth. The work is being done concurrently with the QEII Halifax Infirmary Expansion Project to reduce costs and disruption. NS Power has a cost-sharing agreement with the QEII project for this work, expected to save approximately $2 million.

REDACTED CI C0074130 Page 2 of 11 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 7
REDACTED CI C0074130 Page 2 of 11 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Given the anticipated load growth, additional electrical capacity is required to reliably serve customers. By increasing the available capacity within key corrid...

AI summary The document discusses the need for additional electrical capacity in key corridors like Robie St to meet anticipated load growth, emphasizing the importance of integrating new supply and leveraging existing and planned substation capacity.

99383NSEB (NSPI) IR 1 to 14 1 passage
Request IR-4:
Request IR-4: - Page 1 of the application states: "NS Power will install a larger ductbank and a second - underground supply that is needed to support anticipated load growth in the near future due to - multiple planned developments which...

AI summary The document contains several requests for information related to NS Power's infrastructure planning in the Robie Street corridor and surrounding areas. Topics include load growth forecasts, cost savings estimates, asset life expectancy, and project scope related to electrical reconfigurations and capacity expansion.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →