Topic/Matter Intersection

Topic:"Power Infrastructure" in M12550

Matter: To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
2 passages 2 documents

Power Infrastructure across all matters →

N-2NSPI (Midgard) RIR 1 to 14 - Redacted 1 passage
REDACTED Review of C0051815 NSEB IR-5 Attachment 12 Page 4 of 4 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 62-63
REDACTED Review of C0051815 NSEB IR-5 Attachment 12 Page 4 of 4 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Remote Terminal Unit (RTU) Supplier of Choice Recommendation – RFP-01/2023-053 C July 2023

AI summary The document discusses a recommendation for selecting a Remote Terminal Unit (RTU) supplier through a Request for Proposal (RFP) process, specifically RFP-01/2023-053, issued in July 2023 as part of a Nova Scotia Energy Board proceeding.

N-3Evidence - Midgard - Redacted 1 passage
p. p. 42
Resource Category Primary Responsibility Tasks and Deliverables Telecontrol Technologist Responsible for RTU ▪ Configure RTU communication interfaces (Ethernet, serial) communications and SCADA ▪ Set up and validate communication protocols...

AI summary The document outlines various roles and responsibilities associated with the installation, configuration, and maintenance of RTU (Remote Terminal Unit) systems within a power grid context. It details tasks for Telecontrol Technologists, RTU Technicians, Electrical Engineering Technologists, and a Drafting SME – CADD, emphasizing communication protocols, field operations, and technical documentation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →