Matter: Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)
14 passages 7 documents

Power Infrastructure across all matters →

N-3Evidence - PHP 1 passage
8 Q. Please provide an update on the status of the PHP Goose Harbour Lake 9 Wind Farm Project.
8 Q. Please provide an update on the status of the PHP Goose Harbour Lake 9 Wind Farm Project. 10 11 A. The project is currently on schedule and the first significant phase of 12 construction is completed including roads, foundations and t...

AI summary The PHP Goose Harbour Lake 9 Wind Farm Project is on schedule, with the first construction phase completed. Ongoing work includes substation and operations building construction, with wind tower components ready for shipping in spring 2026. The first 42MW circuit is expected online by late Q3/early Q4 2026, achieving full commercial operations by December 2026.

N-6NSPI (IG) RIR 1 to 31 - Redacted 4 passages
ANALYSIS OF AVERAGE UNDERGROUND WIRE INVESTMENT p. p. 181
ANALYSIS OF AVERAGE UNDERGROUND WIRE INVESTMENT (1) (2) (3) (4) (5) TOTAL PRIMARY PRIMARY SECONDARY SECONDARY PLANT DEMAND CUSTOMER DEMAND CUSTOMER (1) FACTORS 1.000 0.056 0.011 0.171 0.762 (2) TOTAL NET WIRE COST $61,657 $3,453 $678 $10,5...

AI summary The document presents a table analyzing average underground wire investment, categorizing costs into primary and secondary demand/customer segments. Total net wire cost is $61,657, with primary customer costs at $678 and secondary customer costs at $46,983. Factors influencing investment allocation are quantified across categories.

FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) p. p. 181
FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) (1) TOTAL (2) TOTAL (3) UNIT COST (4) TOTAL (5) (6) (7) VARIANCE CALC (205) VP HUMAN RESOURCES (206) HUMAN RESOURCES 11,248.4 (208) POWER PRODUCTION (209) POWER PRODUCTION - F...

AI summary The document presents a financial overview of various operational and production costs for the year ending December 31, 2027, including expenses related to human resources, power production, fuel, and purchased power. It details costs across different energy sources such as biomass, wind, solar, and hydro, as well as expenses for environmental policy and executive functions.

FOR THE YEAR ENDING DECEMBER 31, 2026 (IN THOUSANDS OF DOLLARS) p. p. 181
FOR THE YEAR ENDING DECEMBER 31, 2026 (IN THOUSANDS OF DOLLARS) (1) TOTAL DMD.RELATED (2) TOTAL ENG.RELATED (3) UNIT COST ENG.RELATED (4) TOTAL CUST.RELATED (5) TOTAL OPER. (6) TOTAL RATE (7) % REVENUE VARIANCE CALC (203) POWER PRODUCTION...

AI summary The document presents financial data related to power production and purchased power for the year ending December 31, 2026, including expenses for biomass, gas turbines, wind, and imports. It includes details on incentive plans, demand-side management (DSM) expenses, and other overhead costs.

FOR MARCH 2026 p. p. 181
FOR MARCH 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM C...

AI summary The document presents a summary of energy sales, losses, and demand metrics for March 2026, including total MWH sales, energy line losses, energy requirement, and system demand factors.

N-10NSPI (Synapse) RIR 1 to 30 - Redacted 4 passages
EXHIBIT 3 PAGE 2 OF 5 p. p. 61
EXHIBIT 3 PAGE 2 OF 5 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) (12) ALLOCATION (4) TOTAL PLANT IN SERVICE 918,054 605,701 30,921 167,794 19,126 17,188 22,095 34,296 3,480 13,068 4,385

AI summary This table presents data on total plant in service, categorized by different sizes and types, with figures provided for various columns including total, small, general, medium, and large. The data includes specific numerical values for each category.

REDACTED ELID Tariff Synapse IR-30 Attachment 2 Page 14 of 15 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 191
REDACTED ELID Tariff Synapse IR-30 Attachment 2 Page 14 of 15 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Category Usage Data Medium Industrial 37,761,228 34,388,307 37,154,644 34,300,556 36,745,594 38,469,740 38,399,377 35,849,667 35,276,...

AI summary The text presents a table containing usage data categorized by different industrial and municipal sectors, including figures for Medium Industrial, Large Industrial (FIRM and INT), PHP, and Municipal. The data spans multiple years and includes totals for each category.

NOVA SCOTIA POWER INC. FUNCTIONALIZATION OF OPERATING EXPENSES FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) p. p. 191
NOVA SCOTIA POWER INC. FUNCTIONALIZATION OF OPERATING EXPENSES FOR THE YEAR ENDING DECEMBER 31, 2027 (IN THOUSANDS OF DOLLARS) EXHIBIT 4 - Detail A PAGE 5 OF 6 (1) (2) SHORE GEN.REPL (3) (4) (5) (6) REAL TIME (7) (8) (7) (8) POWER LOAD FOL...

AI summary This document presents the functionalization of operating expenses for Nova Scotia Power Inc. for the year ending December 31, 2027. It details various costs related to power production, including thermal, hydro, wind, solar, biomass, and combustion turbine operations and maintenance, as well as fuel procurement and generation development.

REDACTED ELID Tariff Synapse IR-30 Attachment 4 Page 12 of 15 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 100
$3,627,090 $2,521,417 $2,850,490 $2,534,080 $2,191,956 $1,916,096 $2,250,818 $2,157,931 $3,711,916 $3,788,118 $33,418,031 Purchased Power Wind $ 13,164,243.69 $ 14,283,765.76 $ 16,273,457.62 $ 13,857,420.27 $ 12,582,203.02 $ 10,596,475.95...

AI summary The document contains a series of financial figures related to wind generation, purchased power, and operational and maintenance costs. It includes data from various systems such as NRIS, ERIS, and FAM, and references OATT. The numbers represent costs and revenues over a period of time.

N-52Vincent Musco's CV 1 passage
Presentations and panels
Presentations and panels - "Electric Vehicles." Panelist at 47th Annual Public Utility Research Center Conference at the University of Florida "Rates, Realities, and Risks: Ratemaking for Tomorrow." Gainesville, FL (February 2020). - "Barr...

AI summary The text lists various presentations and panels attended by individuals in the energy sector, focusing on topics such as electric vehicles, community solar adoption, competitive procurement, and strategic issues in the electricity business. These events highlight discussions on energy policy, renewable resources, and power planning.

N-53Collin Cain's CV 1 passage
Selected experience
Selected experience - Evaluated PJM price formation, demand responsiveness, and demand response compensation proposals for comments submitted on FERC's ANOPR on "Wholesale Competition in Regions with Organized Electric Markets" (Docket Nos...

AI summary The text outlines the expert's experience in evaluating energy market regulations, providing testimony, and participating in FERC proceedings. Key areas include PJM price formation, demand response compensation, VPPA settlements, modifications to the minimum offer price rule, and rate design proposals for large loads.

N-55Response to Undertakings 1-15 - NSPI - Redacted 2 passages
EXHIBIT 8B PAGE 1 OF 3 p. p. 1
EXHIBIT 8B PAGE 1 OF 3 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) (10) (11) (12) ALLOCATION (14) % RESPONSIBILITY 100.00% 62.71% 3.32% 17.23% 1.97% 1.80% 2.08% 9.07% 0.00% 1.35% 0.47% (15) DEMAND - TRANS. PL...

AI summary This exhibit presents a detailed breakdown of percentages of responsibility and associated costs for various categories, including demand and energy across different plant types and sizes, with references to specific pages (e.g., P-8A, P-8B).

FOR FEBRUARY 2027 p. p. 1
FOR FEBRUARY 2027 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTE...

AI summary The document presents a detailed table with data on energy sales, losses, and demand across various customer classes for February 2027. It includes metrics such as energy line losses, demand factors, and system peak demand. The table is part of a redacted attachment related to the ELID Tariff U-1.

20261021-1Hearing Transcript — 10/21/2026 (MICHAEL WILLETT, ERIC FERGUSON, CRAIG MOWATT, DAVID STANFORD) 1 passage
NOVA SCOTIA POWER PANEL 321 Cr-ex, (Rudderham)
NOVA SCOTIA POWER PANEL 321 Cr-ex, (Rudderham) 1 A. (Mowatt) The billing period itself is 2 a month. So it would just be carrying forward to a future 3 month, not to a future year. There's an annual 4 reconciliation process per the PSA tha...

AI summary The text discusses the billing period for a project, which is monthly but reconciled annually. It also covers administrative fees that increase if load falls below a certain level, and how energy from a wind farm is injected into the grid and transported to PHP without line losses. An undertaking is made to provide the specific provision in the agreement or regulations regarding line losses.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →