NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: AN APPLICATION by NOVA SCOTIA POWER INC . for approval of CI C0061550 – L5031 Replacements and Upgrades – Hubbards to East Chester – $6,957,058 (...
AI summary The Nova Scotia Energy Board is considering an application by Nova Scotia Power Inc. for approval of a project involving replacements and upgrades on the transmission line from Hubbards to East Chester, with an estimated cost of $6,957,058.
Request IR-2: - Please provide a GIS map showing the overall L5031 transmission line path, identifying the - locations of the deteriorated structures being replaced under the original scope, the additional - structure replacements, the mob...
AI summary Request IR-2 asks for a GIS map of the L5031 transmission line path, including locations of deteriorated structures being replaced, additional replacements, a mobile substation, and bypass structures.