Matter: Nova Scotia Power Inc. - CI C0059046 - 101S and 79N Reactor Replacements - $827,209 (FIN)
2 passages 2 documents

Power Infrastructure across all matters →

N-1CI C0059046 - 101S and 79N Reactor Replacements - Application 1 passage
DESCRIPTION: p. p. 1
DESCRIPTION: This project is for the replacement of three air core shunt reactors, along with the purchase of one net new spare reactor. These reactors are being purchased to address three in-service failures, two of which occurred at subs...

AI summary The project involves replacing three failed air core shunt reactors and purchasing a new spare reactor to address failures at substations 101S and 79N. A spare reactor is already in place at 101S, and additional reactors will be procured to replace the remaining failed unit and replenish the spare. At 79N, a new reactor will be installed to replace the failed one and a new spare will be added for system use.

1030692026 Q2 Capital Reports 1 passage
2nd Quarter Overview - as of June 30, 2026
2nd Quarter Overview - as of June 30, 2026 ACE Plan Reference Submission or 1 Approved Transmission Transmission C0050835 C0052055 2023/2024 Steel Tower Refurbishment 2023/2024 Transmission Right-of-Way Widening 69kV P&A OTQ - December 5,...

AI summary The document provides an overview of approved projects under the 2025 ACE Plan, including transmission, distribution, and generation activities with details on costs, submission dates, and actual spending as of June 30, 2026.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →