9.0 CONCLUSION This report presents the results of a Load Impact Study (LIS) assessing the distribution supply options for the proposed MLS Spaceport facility in the Town of Canso. Several alternative solutions were explored during this as...
AI summary This conclusion outlines the proposed solution for supplying 3 MVA to the MLS Spaceport facility in Canso using a 25 kV supply from the 24C-442 feeder. Key modifications include equipment installation and line extensions. Future expansion would require a new or upgraded 69-25 kV source. NSPI will not proceed with upgrades until customer plans are submitted for approval.