Topic:"Procurement Practices" in M11927

Matter: Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)
6 passages 4 documents

Procurement Practices across all matters →

N-3NSPI (CA) RIR-1 to 18 - Redacted 1 passage
NSPI Response: p. p. 49
NSPI Response: NSPI does not typically have signed/stamped drawings as part of the Request for Proposal stage of the project. The signed and stamped drawings are typically issued after the project has been awarded. Appendix A includes a le...

AI summary NSPI explains that signed/stamped drawings are not typically part of the RFP stage and will be issued post-award. Appendix A and B provide details on the 30% drawings, and full-size engineering drawings will be delivered soon. The procurement phase is set to begin in late February/early March with a target award by early April.

N-6NSPI (NSUARB) RIR-1 to 13 - Redacted 3 passages
Section 95 p. p. 42
7 (d) Materials costs associated with "Supply of Gates and Actuators" and "Supply of Rubber 8 Dams" are lower than the costs shown in the 2019 ACE Plan Application because the costs 9 used in the ACE submission were based on estimates from...

AI summary The document discusses lower material costs for gates, actuators, and rubber dams due to a competitive RFP process, and mentions the need for a backup generator for construction during winter months, recommended by the electrical designer engineer.

CI 50518 - HYD - Ruth Falls Main Dam Refurbishment ATO (NSUARB M11927) NSPI Responses to NSUARB Information Requests p. p. 42
CI 50518 - HYD - Ruth Falls Main Dam Refurbishment ATO (NSUARB M11927) NSPI Responses to NSUARB Information Requests 1 (f) The following scope of work was included as part of the Limited Notice to Proceed: 2 • Environmental management; 3 •...

AI summary The document outlines the scope of work for the Ruth Falls Main Dam Refurbishment ATO, including environmental management, water control, and procurement activities. It also discusses revised costs for the Rubber Dam Installation due to a competitive RFP process and the need for a proactive inspection of the rubber dams due to storage delays.

REDACTED CI 50518 NSUARB IR-11 Attachment 2 Page 57 of 66 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 115-117
REDACTED CI 50518 NSUARB IR-11 Attachment 2 Page 57 of 66 REDACTED (CONFIDENTIAL INFORMATION REMOVED) REDACTED CI 50518 NSUARB IR-11 Attachment 2 Page 58 of 66 Ruth Falls Dam Refurbishment RFP-P-20-259-01

AI summary The document contains a redacted page from a regulatory proceeding related to the Ruth Falls Dam Refurbishment RFP-P-20-259-01. The page includes images and is part of a larger submission, likely concerning infrastructure planning or procurement practices.

N-8Midgard Evidence - Redacted 1 passage
Project Engineering Representative, Chalk River ON p. p. 51
Project Engineering Representative, Chalk River ON - Interacted with design participants, operations engineering, technical staff, and nuclear operators to obtain technical input as required to meet project and client requirements in an In...

AI summary The Project Engineering Representative at Chalk River ON is responsible for providing technical support throughout various project phases, ensuring quality, budget, and schedule adherence, and managing changes in design and scope through proper control processes.

95871NSUARB (NSPI) IR-1 to 13 1 passage
Request IR-11:
- l) Please describe the scope of "Offsetting (West River Project)" costs and explain how the cost was developed. m) Please provide documentation from DFO confirming the scope of the required Offsetting work. n) What is the Class level and...

AI summary The document contains a series of requests related to the West River Project and the Ruth Falls project, including inquiries about cost estimation, documentation from DFO, changes in project scope, procurement processes, and response timelines to DFO's information requests.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →