Matter: Nova Scotia Power Inc. - CI C0032664 – Energy Control Centre – Optimization Tools - $7,486,068
5 passages 1 document

Procurement Practices across all matters →

N-2NSPI (NSEB) RIRs 1-20 - Redacted 5 passages
Section 19 p. p. 12
1 3 - 4 High-level business requirements (pre-procurement) - 5 Detailed design/configuration requirements (post-procurement)

AI summary The document outlines two phases of business requirements: high-level requirements before procurement and detailed design/configuration requirements after procurement.

REDACTED p. p. 117
REDACTED 1 Request IR-7: 2 3 Has a Request for Proposals (RFP) been issued for the supply of the proposed system? 4 5 (a) If so, please provide a summary of the results. 6 7 (b) If not, when will an RFP be issued? 8 9 (c) Or please explain...

AI summary An RFP was issued for the Energy Control Centre Portfolio Optimization solution and the Outage Request Platform solution. A table summarizes the RFP results, including criteria such as adherence to RFP requirements and ongoing support availability and service levels.

Criteria Vendor 1 Vendor 2 Vendor 3 Vendor 4 p. p. 117
Criteria Vendor 1 Vendor 2 Vendor 3 Vendor 4 Adherence to RFP Requirements Ongoing support availability and service levels Speed and efficiency of implementation (or project) plan, availability, and delivery Experience in the industry and...

AI summary The table outlines evaluation criteria for vendors based on their RFP responses. Vendor 1 was selected as the successful proponent. The absence of values indicates that certain criteria were not included in the RFP response.

Section 246 p. p. 117
5 Vendor 1 was the successful proponent. Zero values indicates that the criteria was not 6 included in the RFP response. 7 8 (b-c) N/A.

AI summary Vendor 1 was selected as the successful proponent. Certain criteria were not included in the RFP response, as indicated by zero values.

REDACTED p. p. 117
REDACTED 1 Request IR-9: 2 3 What other optimization tools were considered compared to the proposed tools? Please 4 explain why the proposed tools were the preferred option and provide any economic analysis 5 that was prepared. 6 7 Respons...

AI summary NS Power conducted extensive vendor evaluations and meetings to identify optimization tools for economic dispatch, outage management, and IT communications. While vendors were considered, none met the IT Communications Platform requirement, leading to in-house development. An economic analysis was prepared to assess efficiency improvements and operating cost reductions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →