Matter: Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 10-Year System Outlook Report for 2026
4 passages 4 documents

Procurement Practices across all matters →

N-3IESO (IG) RIR 1 to 4 1 passage
Response IR - 1 p. p. 7
Response IR - 1 - a,b) The expansion and acceleration of IESO Nova Scotia's second procurement process is aligned with the resource plan identified in the 2026 10 Year System Outlook. - c) The commissioning of 150 MW of BESS capacity in 20...

AI summary IESO Nova Scotia's second procurement process is aligned with the 2026 10 Year System Outlook and the Clean Power Plan. The commissioning of 150 MW of BESS capacity in 2025 and 2026 partially meets the 300-400 MW energy storage target. The procurement process will refine the optimal capacity, timing, and technology for future resources.

103515Notice of Intervention - SWEB 1 passage
RE: M12916 – NSIESO 10-Year System Outlook Report for 2026
RE: M12916 – NSIESO 10-Year System Outlook Report for 2026 SWEB Development is a developer, owner, and operator of renewable energy projects throughout Eastern Canada, headquartered in Halifax, Nova Scotia. The M12916 10-Year System Outloo...

AI summary SWEB Development requests intervenor status in M12916, highlighting the importance of topics such as generation planning, future procurements, renewable electricity targets, and transmission planning as they relate to renewable energy growth in Nova Scotia.

103608NSEB (IESO) RIR 1 to 19 1 passage
Preamble
- For each project listed: - a) identify whether the large load is commercial or industrial; - b) describe the predominant type of load proposed for each facility; - c) identify the proposed interconnection point (i.e., transmission line o...

AI summary The text outlines requirements for identifying and describing details of large load projects, including their type, load characteristics, interconnection points, and anticipated in-service dates.

104080Submissions - CA 1 passage
B. Trenton and Lignan Retirements p. p. 2
B. Trenton and Lignan Retirements With respect to the Trenton and Lingan coal units, the Report states: Previous 10-year load and resource outlooks presented retirements of Trenton 5 and Lingan 2 in Winter 2027/2028. Based on the current e...

AI summary The report discusses the retirement timeline for the Trenton 5 and Lingan 2 coal units, noting that they may need to remain in service until Winter 2029/2030 due to the need for reliable replacement capacity. The IESO NS highlights the need for coordination with NS Power and the lack of detailed cost information for maintaining these units.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →