Topic/Matter Intersection

Topic:"Procurement Practices" in M13175

Matter: Nova Scotia Power Inc. - 2027 Annually Adjusted Rates (AARs)
2 passages 1 document

Procurement Practices across all matters →

N-1Application - Redacted 2 passages
Preamble p. p. 37
- "CCi" is a capacity contribution factor of LRS' generator to NS Power's system peak as determined by NS Power. The capacity contribution factor may be the subject of periodic adjustment if operating conditions of the generator, such as a...

AI summary The text defines the Capacity Contribution Factor (CCi), which measures a Licensed Retail Supplier's (LRS) generator contribution to Nova Scotia Power's system peak. It establishes that NS Power determines this factor and notes that it is subject to periodic adjustment if generator operating conditions, such as prolonged deration, deviate from initial assumptions. For non-dispatchable resources, the CCi must be determined using the Effective Load Carrying Capability (ELCC) methodology as specified in the Integrated Resource Plan.

WHOLESALE MARKET BACKUP/TOP-UP SERVICE TARIFF Page 5 of 6 p. p. 37
WHOLESALE MARKET BACKUP/TOP-UP SERVICE TARIFF Page 5 of 6 - (iv.) Any export transactions utilizing energy from the Internal Resource will be recallable by the NSPSO, up to the amount contracted to the wholesale customer, for delivery to t...

AI summary This section outlines the tariff requirements for Wholesale Market Backup/Top-up Services, specifically detailing the protocols for utilizing Internal and External Resources during resource adequacy needs. It establishes rules for the recall of energy from Internal Resources and specifies documentation requirements for External Resources. For External Resources, customers must provide asset locations, generator data, proof of contractual control, and attestations regarding capacity availability and curtailment priority to ensure system reliability.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →