Topic:"Program Requirements" in M08059

Matter: Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization
1 passage 1 document

Program Requirements across all matters →

74454NSPI's comments on Synapse Report - Redacted 1 passage
Section 16
bon reduction requirements, federal equivalency and the operation of the Maritime Link. With regard to the study framework proposed by Synapse, the Company suggests consideration of the following: • Whether the period of study needs to be...

AI summary Nova Scotia Power (NSP) questions Synapse's proposed 25-year study framework, raising concerns about resource availability (e.g., NB transmission, battery storage), uncertainty in federal/provincial regulations, and the need for clarity on DSM program selection criteria. NSP also notes the Board's planned 2018 DSM hearing and lack of reference plan criteria.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →