Executive Summary Page II-1 PRELIMINARY DESIGN BASIS BARK & SAW DUST FUEL BOILER Option 1 Option 2 Boiler heat input 33.6 42.0 mmbtu/hr Total Heat Input 33.6 42.0 mmbtu/hr Fuel Rate PPH 7,814 9,767 pph Fuel Rate TPY 20,535 38,502 ton/yr at...
AI summary The document presents preliminary design basis details for two options of a bark and sawdust fuel boiler, including parameters such as boiler heat input, fuel rates, steam output, efficiency, and air quality control specifications. The comparison highlights differences in performance and emissions between the two options.